Laserfiche WebLink
J. ~. STOVER & ASSOCI~ES <br />2768 COMPASS DRIVE, SUITE 101 <br />GRAND JUNCTION, COLORADO 81506 <br />PHONE: (970) 245-4101, FAX 242-7908 <br />MINE ENGINEERING <br />MINE RECLAMATION <br /> <br />CIVIL ENGINEERING <br />CONSTRUCTION MANAGEMENT <br />CERTIFIED MAIL <br />RETURN RECEIPT <br />June 6, 1995 <br />Mined Land Reclamation Board <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />4~(~FIVEL~ <br />JUN 0 i3 1995 <br />~wuip„ ,~, ,,,.;riera~ d ueol <br />o9Y <br />Re: Request for Adjudicatory Hearing <br />Phase I Bond Release <br />Coal Ridge No. 1 Mine <br />Permit C-84-065 <br />Dear Sirs: <br />The DMG's letter dated May 26, 1995 transmitted its phase I bond <br />release decision. The DMG denied the bond release request. The <br />Operator, NCIG Financial, Inc., maintains the reclamation was <br />performed in accordance with the approved plan. Therefore, the <br />phase I bond release should have been approved. <br />Please schedule an adjudicatory hearing in accordance with Rule <br />3.03.2(6), <br />Sincerely, <br />~~"T^~-~--- <br />Jim Stover, P.E. <br />Consulting Engineer <br />cc: Barbara Pavlik <br />Rushton 0. Backer <br />