Laserfiche WebLink
<br />~` ~ STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (303) 832-8106 <br />DATE: July 1, 2002 <br />TO: Tom Schreiner <br />Permit #: ~~-~.~3 Confidental?: ~ <br />~ r T eSe _~ DIVISION OF <br />Class: I s o~ YP - Q" ~ ~~ nom,, MINERAL S <br />From: n oYU~So To. o,w & <br />Doc. Name: GMgo: a Y~ u r ° ~( G E O L O G Y <br />Doc. Date (if no date stamp): ~/ off- /~ R E C L A M A T I O N <br />MINING•SAFETY <br />FROM: Allen Sorenson ~~ <br />RE: Stability of Walstrum Quarry Slopes, Al Frei and Sons, Inc., <br />Permit No. M-1983-033 <br />Bill Owens <br />Governor <br />Greg E. Walther <br />Executive Director <br />Ronald W. Cottony <br />Acting Division Director <br />The Division of Minerals and Geology (DMG) has completed a review of the REVEY Associates, Inc. <br />Mazch 2002 report on "Evaluations of Mining Methods Appropriate for Ensuring Stability of <br />Temporary and Long-Term Rock Slopes in Expanded Development areas of the Walstrum Quarry." <br />Site investigations conducted by REVEY Associates at the Walstrum Quarry have determined that the <br />only adverse orientation of rock discontinuity in the quarry azea is north dipping foliation in the <br />Precambrian gneiss quarry rock. If this is the case and if no other adverse planes of rock weakness aze <br />uncovered by future quarry operations, the recommendations contained in the REVEY Associates <br />Report will result in stable final pit wa]ls at the Walstrum Quarry. As a result, the following list of <br />recommendations from the REVEY report must be made enforceable components of the mined land <br />reclamation permit. <br />1. Mining that would create north facing quarry walls striking from N45°W to N45°E is prohibited <br />unless the excavation is accomplished by gradually extending benches orthogonal to the north <br />facing wall using progressively shortened blastholes to create a final slope with an angle matching <br />the dip of the foliation. <br />2. Air-decked chazges, as described in the REVEY Report, aze required for blasting at all final quarry <br />perimeter walls. <br />3. All blasting within 192 feet of final pit walls shall conform to the following millisecond timing <br />guidelines: <br />Inter-Row Delay Range <br />(Per Unit of Burden) <br />3 to 10 ms/ft <br />Hole to Hole Delay Range <br />8 to 17 ms <br />4. Diameter of explosive chazges shall not exceed 6.5 inches. <br />It is stated in the REVEY Report that: <br />Wherever possible, new mining benches should be developed to facilitate mining highest <br />benches ahead of lower benches. By so doing, lazger horizontal offsets can be maintained <br />between benches, which lessens the overall pit-slope-angle. Moreover, exposing a series of <br />