Laserfiche WebLink
iii iiiiiiiiiiiii iii <br />999 <br />DIVISION OF MINERALS AND GEOLOGY <br />Depanmern of Nalaral Rnoun:n <br />,JIJ Sherman Sr.. Room 215 <br />Dern+er. Colorado 8020] <br />Rene: iJ031 b66.7567 <br />RECEIVED <br />rAx:uo31e3~•aloa APPLICATION FORM FOR A REVISE 16 2000 <br />TO A COAL MINING AND RECLAMATION PERMIT <br />Division of Minerals 8 Geology <br />This corm must be completed and submitted with all requests for minor revisions, as defined in ea. Gainer <br />Rule 1.04(73), technical revisions, as defined in Rule 1.041136), and permit revisions, as defined ~OY°1° <br />in Rule 1.04(90), All revisions are to address the requirements of Rule 2.08.4. Three 131 copies la"" s. t°d'nead <br />Faecutire Oireaor <br />of the revision, inGuding maps, must be submitted in order for it to be complete. <br />Mld;,a e. cane <br />olrislan oiuciv <br />All revisions are to be formatted so they can be inserted imo the permit to replace the revised <br />sections, maps, tables and/or figures, with a revised table of contents, if necessary. The revision submittal <br />date should be printed in the lower right corner of each revision page. A cover letter to the revision should <br />explain the nature of the revision and reference the specific permit sections being revised. <br />For lederal mines, a copy of the revision application must be submitted to all agencies on the federal mailing <br />list at the same time the application is submitted to the Division, and proof of distribution must be submitted <br />to the Division along with the application. Copies of revision pages modified during the review process must <br />be distribu[ed in the same manner, along with proof of distribution. Proof of distribution must be submitted <br />prior to implementation of the revision. For non-federal mines, a copy of the application for which the <br />Division has issued a proposed approval decision must be submitted to the OSM Western Regional <br />Coordinating Center 11999 Broadway Blvd., Suite 3320. Denver, CO 80202-5733), and proof of submittal <br />to OSM must be submitted to the Division prior to implementation of the revision. <br />Permit No.: C - ~ Z - ~ ~ ~ Date: ~ _3 I 1 5 / 0 0 <br />Permittee: T W E SL _2 ~ ~ ~ J._ ~ <br /> ~ Q ~ ~ - ~ ~ Nl_ ~ _A_. ILL ~ - - - - <br />Street: Z 3_ S_ ~ -5- - .B- ~- 1L L. L ~~__LI ~ S Y <br /> ~ Q ~~- -~-i y-------- <br /> <br />State: ~ Q Zip Code: ~ ~ +~ .~ Z - - - - - <br />Brief Description of Revision: Installation of crusher at preparation plant <br />Public Notice Attached: Yes - No X (Required for PRs and TRs) <br />Bondlncrease: Yes ~ No- Federal X Non-Federal - Mine <br />Proposed Change in: <br />Disturbed Area (+/.) - - 0 0 Acres Affected Area (+1-) - <br />Permit Area (+1.) - - 0 0 Acres Federal Land (+l-) - <br />State Land (+/_) - - 0 0 Acres Private Land (+l-) - <br />STATE OF COLORADO <br />_Q . Q Acres <br />0 0 Acres <br />0 0 Acres <br />