Laserfiche WebLink
.. <br />Richard D Lamm <br />G ovm nor <br />DEPARTtv~T Of- NATURAL RESOURCES • III III III IIIIIII III <br />O Idpnl~~Pasr a.• E.r•u ilmr Dm~rior <br />MINED LAND RECLAMATION DIVISION ' <br />DAVID C. SHELTON Director <br />~/~4 <br />February 8, 1982 <br />Vance Mi11s <br />Trinidad Basin Mining, Inc. <br />P.O. Box 783 <br />Trinidad, Colorado 81082 <br />RE: Division finding on TBM technical revision of January 11, 1982. <br />Dear Mr. Afills: <br />The Division staff has reviewed the technical revision material submitted <br />on January 11, 1982 and February 5, 1982 and i.s proposing a partial <br />approval of the technical revision at this time. <br />The Division hereby approves the proposed drainage crossing as presented <br />in the technical revision. <br />The Division is not approving the proposed 'land swap' of phases 3, 4, and <br />5 in pit k1, for phases 12, 13, 14, anc' IS in pit b2. The Division feels <br />that the lack of baseline information and lack of approved operation plan <br />and facilities precludes the Division from approvinq this request. <br />At this time you should commence the single publication of the notice of <br />proposed decision, and forward proof of publication to the Division as <br />soon as possi.bie- <br />If you have any questions feel free to call myself or Fred Banta. <br />Sincerely, <br />M~-~s.~ <br />Michael S. Sava <br />Reclamation Special i..st <br />MS:ep <br />!~ <br />423 Centennial Building. 1313 Sherman Street Denver. Colorado 80203 Tel. (303) 866-3561 <br />