My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV93571
DRMS
>
Back File Migration
>
Revision
>
REV93571
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:14:54 AM
Creation date
11/21/2007 11:32:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Revision
Doc Date
6/17/2005
Doc Name
Incompleteness Letter
From
DMG
To
Twentymile Coal Company
Type & Sequence
TR50
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman SL, Room 215 C O L D RA D O <br />Denver, Colorado 80203 DIVISION o F <br />Phone: (303) 866-3567 M I N s RA L$ <br />FAX: (303) 832-87tH G E O L O G Y <br /> 0.ECLA NATIO N•NINING <br /> SAfETY6ClENCE <br />June 17,2005 <br />Bill Owens <br />Governor <br />Jerry. Nettleton <br />Twentymile Coal Company Russell George <br />Executive Direttor <br />29515 Routt County Road No. 27 <br />Oak Creek, CO 80467 Ronald w. Carcany <br />Division Direttor <br />Natural Resource Trustee <br />Re: Foidel Creek Mine (Permit No. C-1982-056) <br />Technical Revision No. 50 (TR-50) <br />Modification of Topsoil Stockpiles at the 18-Right Ventilation Shaft <br />Dear Mr. Nettleton: <br />We have received your application for a technical revision to your permit to conduct coal mining in Colorado. Our initial <br />review indicates that all preliminary items required by Rule 2.08.5(4) have not been submitted. Thus, your application is <br />incomplete for the purposes of filing as of June 17, 2005. <br />In accordance with Rule 2.07.3(1), you have the opportunity to amend, review, or otherwise make your application complete. <br />Please provide designs for the ditches about the proposed topsoil piles to make the application complete. <br />In addition, advance notice is herein given of two adequacy items that were recognized during our review. The pagination does <br />not provide for continuity of text. Quantities of topsoil in the stockpiles were not identified along with a description of the plan <br />for replacement (quantities and haul distances). The original cost estimate recognized smaN distance pushes from the windrows <br />back over the adjacent regraded roadway. The revised plan requires haulage of topsoil to reaches oflay-down areas. <br />I f you have any questions, please contact me. <br />Sincerely, <br />Byron G. Walker <br />Environmental Protection Specialist <br />BG W/Ahd <br />C-TR-01 CI982056 BGW 2005061] 1fl55 PM <br />Office of Office of Colorado <br />Mined Land Reclamation Active and Inactive Mines Geological Survey <br />
The URL can be used to link to this page
Your browser does not support the video tag.