My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-07-19_REVISION - M1999002 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1999002
>
2000-07-19_REVISION - M1999002 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:57:06 PM
Creation date
11/21/2007 11:31:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999002
IBM Index Class Name
Revision
Doc Date
7/19/2000
Doc Name
SODIUM LEASE BOND CALCULATION FOR AMERICAN SODA LLP
From
BLM
To
KAREN PURVIS
Type & Sequence
TR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ageucy or organization name: Colorado Division of hlinerals and Geology <br />Pe;mil or job action :Bond for ll-i year se:f~ce disturbance & 27 producnon wells for American Soda L.L.P. <br />TASK LIST (DIRECT COSTS) <br />gip. TASK DESCRTPTIO\ <br />-0U1 -\lobilize'Demobilize(Test and CommerciaLtiline) <br />001 -Denmliliar (T~1t and Commercial Hine) <br />OJa -Fence Removal (Test 14ine Pend) <br />031 -Grading and Topsoil Replacement in Temporary Lay-Down Area <br />003 -Seal 19 Prcdr+nion \Yells (J C Test mme; 26 r! Cornmetcial \iine) <br />03a -Groundira!er ,Llmri.'orirrg For I Year (Test & Commercial Minc) <br />03b -.Suhsir.'ame nloni!orirrg for S}'cars (Test !vh Conrmerc'ia! A:ineJ <br />004 -Bacifill R Grade Drilr Pcds & Associated Aoads ;Test 6 Corrrrnercinl ,lfiu f <br />005 -Barltll axd Grnde Piccance Sile Fanlilies dreg <br />006 -Finirlr Grade Pmennce Sirc £atriilies Area <br />007 -Baclfill acrd Grade Stunuu~aler Pond <br />008 -Bac~ll and Grade plain Access Ro.d <br />009 -Bnay'ril and Grade Ifcll Field Sen•icc Road <br />010 -Bacljd! acrd Grade resl.74ine Portd <br />OI 1 -Bncl~ll mrd Grade Test \line Facility Pod <br />0/.' -Replace Topsoil on Drill Pads d As-socialed Roads <br />013 -Renlnce Topsoil on Picecnec Sile Facili!,'es Brea <br />014 -P.eplace Topsoi! are Piccance Sile \1ain Access Road <br />111 S -Replace roproil ore li ell Field Sen•ice Road <br />016 -Replace Topsnl ul Test Dline Facility <br />017 -BnrJ.frl1 ~ Grede }ellorv CrceA lecp Trail Realigrtmenl <br />0l B -Replace Topsoil on Yellow Creek Jeep Trail Reaho mem <br />019 -Rerrgrlale Grasscv and Forbs, disturbance through 0-5 yr. panel <br />010 -Rerrgelnle SLrvbs and Trees, disturbance through 0-S yr. panel <br />UIl -FLrg.linniPorirrg Nnles (Tcsl ,iliac B 0-S y~r. Panel) <br />SUBTOTALS: <br />includes in(lanon factor adjustment of <br />L~IDIRECT COSTS <br />OVERHEAD Ay-D PROFIT - <br />DIRECT' <br />case <br />517,057 <br />51,430,153 <br />S3,G43 <br />Sl4,019 <br />51,178,41: <br />Sd9,000 <br />S 10,OUD <br />5172,935 <br />5/6,SR5 <br />5976 <br />56, 331 <br />51_'7, lB4 <br />573.25_3 <br />519,480 <br />54,1!4 <br />Sb7,404 <br />SI0,019 <br />520,094 <br />515,264 <br />511,096 <br />53,1R6 <br />SQ,fi30 <br />5153,810 <br />5171.336 <br />543,844 <br />S3,7f 6,137 <br />A+d ;~ TOTAL DIRECT COST' 53,716,13.' <br />Liahility insurance 1.35 % oJdineU !alai 557,603 <br />Perfornrancc bond 1.03 % njdirec! total 539,010 <br />Job superintendent :1:9 .4`.4 ,,".'A [alai 514,000 <br />Profit IO.OU %oJdtrecf total 5371,6?! <br /> TOTAL 0 & P 5492?46 <br />COV7'IL1CT Ah10UNT' (d(recl +0 d 1 4.208.482 <br />-~ <br />c <br />r <br />co <br />•, <br />0 <br />o ~ <br />E <br />m <br />0 <br />0 <br />N <br />cn <br />rn <br />3 <br />• <br />-+-t <br />x <br />Z <br />0 <br />w <br />0 <br />N <br />W <br />~w <br />co <br />w <br />v <br />cD <br />ra <br />~u <br />A'ore: This bond estimate is from the DS1G and in agreement ss~th SL~i and does not include a production band. °w <br />
The URL can be used to link to this page
Your browser does not support the video tag.