~~ . . <br /> <br />EXHIBIT L <br />RECLAMATION COSTS <br />These reclamation costs assume that all stockpiles are removed from the pit <br />floor. The side slopes are set at no steeper that 3H:1 V during the mining <br />operation. Once the toe of the pit wall has reached its point the slope is shaped <br />accordingly. Please see the areas marked on the reclamation cost map (Map L.1) <br />for a better understanding of the finished area. Topsoil will only be required in <br />areas shown. The balance of the side slopes will have had topsoil applied (area <br />checkered on Map L.1). <br />Listed below is a table of our projected reclamation costs: <br />IIF~-1J0 DF~CRIeTLO.N <br />1 Backfill 8 Rough Grading <br />2 Rip pit floor for compaction <br />3 Finish grade side slopes <br />4 Spread topsoil 3" thick on <br />slopes and pit floor <br />(AVG HAUL < 700 LF) <br />5 Seeding <br />QUANLILY <br />500 <br />16.3 <br />2.1 <br />18.4 <br />7500 <br />UNII <br />CY <br />ACRE <br />ACRE <br />ACRE <br />CY <br />UNIT <br />RATE AMOUNT <br />$5 $250 <br />$150 $2,445 <br />$100 $210 <br />18.4 ACRE <br />ADD PROFIT & OVERHEAD 10.0°h <br />TOTAL RECLAMATION COST <br /> <br />$1.50 $11,250 <br />$500 $9,200 <br />$23,355 <br />$2,336 <br />$25,691 <br />