Laserfiche WebLink
<br />EXHIBIT E <br />RECLAMATION PLAN <br />GF_NERAL DESCRIPTION <br /> <br />The primary present use of the land is rangeland. The primary future use of the <br />land will be rangeland. See Exhibit I for more complete soils information. <br />The property is located in the northern section of an oversize tract of irrigated <br />farm land. Even prior to the installation of a center pivot sprinkler, the ground was <br />way to rocky and permeable to raise any kind of crop. This is why the property <br />owner allowed the development of the first pit. My files indicate mining has <br />occurred here since before 1973. <br />Topsoil is very limited averaging in depth less than 6". A stockpile of topsoil <br />currently exists as shown on Map E.1. Once the mining.has been completed to <br />the northwest making a rectangle, this topsoil will be spread on the side slopes. A <br />new topsoil stockpile will be created just inside the west boundary of the ? <br />permitted area in the same fashion as the existing one. This topsoil will be used ~,, l;,~d ~~ <br />on the new slopes created when this west end of the area is mined. wP~-.~c ~~ <br />The entire floor of the pit will not be seeded until all mining has ceased and final <br />reclamation is performed. The floor will be used to store gravel until the mining <br />operation is complete. <br />RECLAMATION <br />Upon completion of the mining operation, the land will be rectangular shaped with <br />side slopes not greater than 3 to 1. The eastern slope and the east 550' of the <br />southern slope of the pit are already reclaimed. It was the first mined in the early <br />70's and has been shaped and reclaimed for many years. Because of Bean Lane, <br />no further activity is possible in this area. <br />See Map E.1 for pit in its current state. <br />The north side slope is shaped 500' west of the northeast corner. Slopes are at <br />least 3H:1 V. Topsoil has not been applied. <br />The bottom of the existing pit has been mined to its full depth. <br />The existing asphalt road from the gate to the pit floor shall remain after <br />reclamation, so the property owner will have good access when needed.rd'- <br />Duriny the mining operation each section of the exterior pit wall will be shaped to <br />less than 3 to 1 slope once the toe of the slope has been mined back to its limit. <br />