My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-10-18_REVISION - M1980244 (24)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2004-10-18_REVISION - M1980244 (24)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:49:54 PM
Creation date
11/21/2007 11:28:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
10/18/2004
Doc Name
Ph.IVc VOL.II Tech Specs
From
Golder Associates Inc.
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. CONTRACTOR shall bed and backfill Leak Detection piping with Leak Detection Fill. <br />C. Low Volume and High Volume Solution Collection pipe shall be placed on top of the <br />• geosynthetics, as shown on the DRAWINGS. <br />D. Placement of Low Volume and High Volume Solution Collection pipes shall be coordinated with <br />other operations such as Low Volume Solution Collection Fill, Bedding Fill, SoII Liner and <br />Drain Cover fill placement. Equipment access duectly on geosynthefics is expressly prohibited. <br />Any damage to the geosynthetics caused by CONTRACTOR during pipe placement shall be <br />repaired at the expense of CONTRACTOR. <br />E. A minimum of 5 feet of Low Volume Solution Collection Fill and Drain Cover Fill shall be <br />placed over the top of the pipe before crossing with rubber-tired constuction equipment. If pipe <br />becomes crushed during or after installation by CONTRACTOR'S equipment or methods of <br />construction, the pipe shall be replaced by CONTRACTOR, at no additional cost to CC&V. <br />The CONTRACTOR will be required to demonshzte to MANAGER that the equipment and <br />procedures used aze not detrimental to the piping, at no additional cost to CC&V. <br />CONTRACTOR shall hold pipes in place with sand bags, or other methods approved by <br />MANAGER, until the Low Volume Solution Collection Fill and Drain Cover Fill has been <br />placed. Directly before placement of the Low Volume Solution Collection Fill and Drain Cover <br />Fill, the sand bags will be removed. <br />G. Secondary or tertiary High Volume Solution Collection pipes wIll be attached to the primary <br />pipes with plastic ties or other method approved by MANAGER and CERTIFYING <br />ENGINEER. <br />*** END OF SECTION *** <br />• <br />• <br />Section 02710 Page 3 of 3 Mazch 22, 2000 <br />Piping Golder Associates Revision 4 <br />J10aIOBSW43-21]W VC CER'rIFICAT[ON REPORTPHASE IVC OSACERMPPENOICIESAPPENDIX E TECFIIJ[CAL SPECIF[CATION5~993-309902]IOOR4 DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.