Laserfiche WebLink
SECTION 02710.0 PD'ING <br />PART 1: GENERAL <br />• 1.01 RELATED SECTIONS: <br />Refer to the following Sections for related work: <br />Section 02200.0 -Earthworks <br />Section 02776.0 - Geomembrane <br />Section 02777.0 - Geo[extile <br />1.02 SUBMITTALS: <br />A. CONTRACTOR shall abide by all qualification and submittal requirements. <br />B. CONTRACTOR shall provide product data including MANUFACTURER'S technical data <br />(resin), test data (strength), and SPECIFICATIONS sufficient to allow evaluation by <br />,MANAGER and CERTIFYING ENGINEER. <br />1.03 QUALITY ASSURANCE: <br />A. All work shall be constructed, monitored, and tested in accordance with the requirements of the <br />CQA Plan. <br />B. Any work found unsatisfactory or any work disturbed by subsequent operations before <br />acceptance is granted shall be corrected by CONTRACTOR as directed by MANAGER at no <br />additional cost to CC&V. <br />• PART 2: PRODUCTS <br />2.01 MATERIALS: <br />A. High Volume Solution Collection Pipe: <br />1. 4-inch "Highway Grade" perforated corrugated polyethylene (PCPE) pipe, as <br />manufactured by Advanced Drainage Systems, Inc., or an equivalent approved by <br />MANAGER, DESIGN ENGINEER and CERTIFYING ENGINEER. <br />2. S-inch diameter "N-12" PCPE pipe, as manufactured by Advanced Drainage Systems, <br />Inc, or an equivalent approved by MANAGER, DESIGN ENGINEER and <br />CERTIFYING ENGINEER. <br />3. 10-inch diameter 'N-12" PCPE pipe, as manufactured by Advanced Drainage Systems, <br />Inc., or an equivalent approved by MANAGER, DESIGN ENGINEER and <br />CERTIFYING ENGINEER <br />4. 15-inch diameter "N-12" PCPE pipe, as manufactured by Advanced Drainage Systems, <br />Inc., or an equivalent approved by MANAGER, DESIGN ENGINEER and <br />CERTIFYING ENGINEER. <br />5. 26-inch diameter solid SDR 11 HDPE pipe, as manufactured by DRISCOPIPE or an <br />equivalent approved by MANAGER, DESIGN ENGINEER and CERTIFYING <br />ENGINEER. <br />• B. Leak Detection Pipe: <br />Section 02710 Page t of 3 March 22, 2000 <br />Piping Golder Associates Revision 4 <br />J baJ085~041-2t]OUVC CER]IEtCA]SON REPOR"MHASE NC OSA CERPAPPENDICIESNPPENDIX E rECFiNICAl SPECIFlCA"r[ONS~993-209902]100R4 DOC <br />