My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-10-18_REVISION - M1980244 (24)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2004-10-18_REVISION - M1980244 (24)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:49:54 PM
Creation date
11/21/2007 11:28:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
10/18/2004
Doc Name
Ph.IVc VOL.II Tech Specs
From
Golder Associates Inc.
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
breaks in grade), unless otherwise directed by MANAGER. The Record Drawings shall include <br />elevations and locations for the following: <br />• ®Underdtain plan view showing the limits of the valley leach facility. Underdrain <br />Fill and underdrain alignment, with elevations every approximately 100 feet or <br />on every break in Bade <br />® Diversion channel plan and profile view along the diversion channel alignment <br />® Leak detection trench plan view showing the limits of the valley leach facility, <br />leak detection trench alignment, and leak detection sumps, with elevations every <br />approximately 100-feet <br />® Soil Liner Fill plan view showing the limits of the valley leach facility, with <br />contours of the Soil Liner Fill and Bedding Fill surface on a 10-foot contour <br />interval, including the regraded ore slopes and end berms <br />® Low Volume Solution Collection piping plan showing the limits of the <br />composite liner, double liner and single liner, and piping alignment with <br />elevations every approximately 100 feet <br />® Perimeter access roads <br />® Top of Upper geosynthetics in the Pregnant Solution Storage Area, including the <br />Vertical Riser Sump and base plates <br />® High Volume Solution Collection piping plan showing the limits of Phase III, <br />• and piping alignment with elevation every approximately 100-feet <br />In addition, the Colorndo licensed surveyor will provide a surveyor's certificate to be submitted in <br />the Construction Certification Report. <br />C. Submittal: <br />CONTRACTOR will submit completed as-built documentation within seven (7) calendaz days <br />upon completion of the work in the following manner: <br />1. Submit two (2) reproducible copies (mylaz) to the MANAGER. <br />2. Submit two (2) non-reproductble copies to the MANAGER on IBM compatible <br />compact disks (CD) on AutoCAD Version 14.0 or newer format. <br />D. The CONTRACTOR will be responsible for performing the following survey activities <br />associated with the Construction Certification Report: <br />1. Provide northing Basting, and elevation for all Soil Liner Fill depth verifications. <br />2. Provide northing, Basting, and elevation for geomembrane panel intersections and <br />destrucfive samples. <br />r1 <br />LJ <br />Section 01050 Page 2 of 3 March 22, 2000 <br />Construction Staking Golder Associates Revision 3 <br />J:\04JOa5\043-21 ]O11VC CERTIFICATION REPORT\PHASE IVC OSA CERTAPPENDICIES\APPENDIX ETECHNICAL SPECIFICATIONS\01050R3.DOC <br />