Laserfiche WebLink
will achieve the required density, or bentonite. Areas with deficiencies shall be <br />reworked by CONTRACTOR, until acceptable measurements aze obtained at no <br />additional cost to CC&V. <br />• 18. If tests indicate the Work does not meet the requirements of the SPECIFICATIONS, <br />MANAGER and CERTIFYING ENGINEER will establish the extent of the <br />nonconforming azea. The nonconforming area shall be reworked by CONTRACTOR <br />until acceptable test results are obtained at no additional cost to CC&V <br />19. Prior to any geosynthetics being placed on Soil Liner Fill, the area will be tested by <br />CQA Monitor. No geosynthetics will be allowed to be placed on frozen material, as <br />defined in Section 3.06, without the area in question being retested by the CQA <br />Monitor. <br />H. Drain Cover FIlI <br />1. Drain Cover Fill shall be placed over the geomembrane in the locations shown on the <br />DRAWINGS. <br />2. Prior to placing the Drain Cover Fill, CONTRACTOR shall verify by visual inspection <br />that the underlying geosynthetics aze free of holes, tears, wrinkles, or foreign objects. <br />MANAGER and CERTIFYING ENGINEER will inspect the geosynthetic for <br />wrinkles prior to placement of Drain Cover FIlI. As instructed by MANAGER, <br />CONTRACTOR shall "work out" wrinkles to the satisfaction of MANAGER and <br />CERTIFYING ENGINEER prior to placement of the Drain Cover Fill. In all cases, <br />wrinkles shall not be of a size that they could fold back on themselves. Wrinkles <br />Beater than one foot shall be removed and repaued by the INSTALLER. <br />3. CONTRACTOR shall place Drain Cover Fill in a single 24-inch loose lift. The <br />• trncked equipment shall operate only over previously-placed Drain Cover Fill. <br />CONTRACTOR shall not opemte equipment duectly on geosynthetics. Only a dozer <br />with a ground pressure not exceeding 8.7 psi can be used to place Drain Cover Fill. A <br />CAT 12G motor grader, or equivalem approved by CERTIFYING ENGINEER, can <br />be used for Drain Cover Fill final grading. Equipment used for placement will not be <br />allowed to pivot on one track (i.e., no abrupt or sharp toms). There shall be no downhill <br />placement on slopes steeper than 4H:1 V. Material can be placed along contours if <br />buttressed from below: Motor graders shall not be allowed to make abrupt turns, brake <br />suddenly, or dig blade in which results in the tires spinning on the Drnin Cover Fill <br />surface. <br />4. Highway compatible Rubber tired construction equipment shall not be allowed to trnvel <br />over the geomembrane or on top of Solution Collection piping unless a thickness of at <br />least 45 inches of Drain Cover Fill has been placed over the geomembrane and on top <br />of Solution Collection piping. The CONTRACTOR will be required to demonstrate to <br />the MANAGER, DESIGN ENGINEER and CERTIFYING ENGINEER that the <br />equipment and procedures used are not detrimental to the geomembrane and piping, at <br />no cost to CC&V. Off road haul truck traffic shall require a minimum of 60 inches for <br />Cat 773 (or equivalent) of Drain Cover FIlI placed over the geomembrane and solution <br />collection piping, and a minimum of 120 inches for CAT 777 (or equivalent) of Aram <br />Cover FID placed over the geomembrane and solution collection piping. <br />5. When placing Drain Cover FIlI the maximum acceptable drop height is 3 feet. <br />I • <br />6. CONTRACTOR shall operate equipment in a manner that is protective of underlying <br />geosynthetics. If MANAGER or CERTIFYING ENGINEER suspects the <br />occurrence of any damage to the underlying geosynthe[ics, MANAGER will instruct <br />CONTRACTOR to remove Drain Cover Fill to expose the geosynthetics. <br />Section 02200 Page 14 of 17 Mazch 22, 2000 <br />Earthworks Golder Associates Revision 7 <br />]:~dIOBSVHI-2l]MIVC CER'fQ~'ICATTON REPOR"MHASE NC OSACER"OAPPENO[CIl:S\APPENOIX 6'rECHMCAL SPEC4iCA'RONS\d2200R]DOC <br />