Laserfiche WebLink
using the specified rings and clamps, and plastic ties are used to coanect the secondary <br />perforated pipes to primary perforated pipes. <br />• <br />Nondestructive Testing -Observe any required testing of the pipe to verify compliance with <br />the project SPECIFICATIONS. <br />PART 7.0 DOCUMENTATION <br />Documentation kept by the CQA Monitor shall consist of daily record-keeping, documentation of <br />construction problem resolutions, documentation of design and SPECIFICATION changes, <br />photographic records, weekly progress reports, chain of custody forms for test sample tracking, and a <br />Construction Certification Report. <br />7.01 DAILY RECORD KEEPING: <br />The CQA Monitor shall keep daily records consisting of field notes, observation and testing data <br />sheets, summary of the daily meeting with the INSTALLER or CONTRACTOR, and reporting of <br />construction problems and resolutions. This information shall be submitted on a regular basis to the <br />MANAGER for review, <br />• <br />7.02 GEOSYNTHETIC OBSERVATION AND TESTING FORMS: <br />The CQA Monitor shall document geosynthetic observations and test results on forms which include <br />the following information: <br />® date, project name, location, and weather data; <br />® identification of panel or seam numbers; <br />® description of ongoing construction, detailing deployment areas; <br />® numbering system identifying test or sample number; <br />® location and identification of repairs and date of repair; <br />® length andfor thickness measurements for geomembrane panels or seams; <br />® welding machine temperatures and settings; <br />® welding machine.and technician identifications; <br />® location of tests and test results; <br />® identification of testing technicians and time of tests; and <br />® signature or initials of the CQA Monitor. <br />7.03 PHOTO DOCUMENTATION: <br />The CQA Monitor shall photograph all phases of construction. <br />• <br />Section 01400.2 Page 9 of 1 l March 22, 2000 <br />Geosynthetic CQA Plan Golder Associates Revision 5 <br />1:\OOIDBS\003-211OWC CERrIFICArION REPOR]NHASE NC OSA CERTNPPENDIC~SWPPENDIX E rECPIMCAL SPEC~ICATIONS\010002RS.DOC <br />