My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-10-18_REVISION - M1980244 (24)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2004-10-18_REVISION - M1980244 (24)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:49:54 PM
Creation date
11/21/2007 11:28:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
10/18/2004
Doc Name
Ph.IVc VOL.II Tech Specs
From
Golder Associates Inc.
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
During geomembrane installation, the CQA Monitor shall observe and document deployment, trial <br />seams, field seaming, non-destructive and destructive seam testing, and repairs to assure that the <br />installation is in compliance with the SPECIFICATIONS. <br />Deplovment -The CQA Monitor shall verify that only approved materials aze used, each panel <br />is given a unique panel number, no geomembrane is placed during unsuitable weather <br />conditions as outlined in Section 02776, Article 1.05 of the SPECIFICATIONS, the <br />geomembrane is not damaged during installation, and anchoring is performed in compliance <br />with the SPECIFICATIONS and design DRAWINGS. The CQA Monitor shall record the <br />deployment on the deployment log form. <br />Trial Seams - The CQA Monitor shall verify that seaming conditions are performed in <br />compliance with SPECIFICATIONS, tests are performed at required intervals, specified test <br />procedures are followed, and retests are performed in compliance with the <br />SPECIFICATIONS. If the ambient air temperatwe measured by the CQA Monitor is above <br />35°F for the entre day, the INSTALLER shall perform trial seams at the beginning of each <br />crew shift, and immediately following any work stoppage (i.e., for lunch, weather conditions, <br />etc.) of 30 minutes or more for each seaming appazatus used that day. If the ambient air <br />temperature measured by the CQA Monitor is below 35°F for the entire day, the <br />INSTALLER shall perform four (4) trial seams, at approximately the same time interval <br />throughout the scheduled work day. Each Seamen shall make at least one trial seam each day. <br />Seaming operation shall not commence until the CQA Monitor has determined that the <br />seaming process is meeting the SPECIFICATION requirement and is acceptable. The CQA <br />Monitor shall record the trial weld results on the trial seam log form. <br />Field Seaming -The CQA Monitor shall verify that only approved equipment and personnel <br />perform welding, all welding is performed under suitable conditions as specified in the project <br />SPECIFICATIONS, specified overlaps are achieved, seams are oriented in compliance to <br />project requirements, and that grinding techniques and exhvdate meet project requirements for <br />• extrusion welding. The CQA Monitor shall record all field seaming on field seaming log <br />forms. <br />Non-Destructive Seam Continuity Testing -The CQA Monitor shall verify that all seams and <br />repair are non-destructively tested in compliance with the project SPECIFICATIONS If a <br />seam cannot be tested, the CQA Monitor shall observe cap strip operations. The CQA <br />Monitor shall verify that test equipment and gauges aze functioning properly and that test <br />procedures are in compliance with the project SPECIFICATIONS. The CQA Monitor shall <br />verify that all seams and repairs with failing test results aze repaired and/or re-tested until <br />passing results are achieved. The CQA Monitor shall record all non-destructive test locations <br />on the vacuum test and pressure test log forms. <br />Destructive Seam Testine -The INSTALLER shall obtain samples, at locations selected by <br />the CQA Monitor, of the field seamed geomembrane approximately 24 inches along and 12 <br />inches across the seam and centered over the seam as follows: <br />® a minimum of one sample per day; <br />® a minimum of one sample for each geomembrane seamen; <br />® a minimum of one sample every 500 feet of seaming; and <br />® seams that appear suspect to the CQA Monitor. <br />I • <br />Section 01400.2 Page 7 of 11 March 22, 2000 <br />Geosynthetic CQA Plan Golder Associates Revision 5 <br />1:\041085\043-21]0\IVC CERrIFICAr10N REPORIIPHASE NC OsA CERI\APPENDICiESWPPENDIX E TECHMCAL SPECfftCA]IONS\OI4002R5 DOC <br />