My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV93163
DRMS
>
Back File Migration
>
Revision
>
REV93163
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:14:30 AM
Creation date
11/21/2007 11:27:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981024
IBM Index Class Name
Revision
Doc Date
12/1/1999
Doc Name
PROPOSED DECISION AND FINGINGS FOR PHASE III BOND RELEASE
Type & Sequence
SL3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />No. 1 and would not be affected by mining activities due to its location. <br />In 1989, the operator requested via Technical Revision No. 10 (TR-10) to terminate <br />hydrologic monitoring. They cited the lack of identifiable impacts from monitoring <br />conducted up to 1989, the lack of mining activity since 1984, and the influence of historic <br />mining activity as evidence to support their request. The operator presented previous <br />Hydrologic Monitoring Reports in support of their position. Division review of the 1986 <br />Annual Hydrology Report (R. Price, April 1987) "did not show any significant trends that <br />would indicate adverse hydrologic impact due to the current mine since the establishment of <br />baseline. " Review of the 1987 Annual Hydrology Report (J. Stevens, Sept. 1988) revealed <br />the finding that "water level and water yualiry data (which) appear generally compatible <br />with that previously reported. Impacts of the mining on local surface and groundwater <br />resources do not seem to be increasing. " Based upon Division review and the conclusion <br />that mining had no identifiable impact on the surface or groundwater regime, Technical <br />Revision No. ]0 (TR-10) was approved in April 1989. <br />All exploration drill holes and groundwater monitoring wells have been reclaimed. Exhibit 9 <br />of the approved permit application contains the abandonment reports submitted to the <br />Division, which contain reclamation information for 1989 and 1993. <br />SUMMARY AND CONCLUSIONS <br />In summary, Kaiser Ventures, Inc. has completed the reclamation plan as currently approved in the <br />permit. The reclaimed lands have achieved the vegetation necessary to meet or exceed the required <br />standards of the approved reclamation plan and the approved post-mining land-use of rangeland. <br />The reclaimed azea blends well into the surrounding area, even to the degree that the reclaimed area <br />is difficult to discern from the undisturbed area. The reclamation appears to be capable of <br />supporting managed grazing. Revegetation appears sufficient to control erosion at the site. There <br />is no further reclamation work remaining or contemplated at this site. No issues or problems were <br />identified as a result of the bond release inspection. Based on the observations and findings as <br />detailed above, the Division proposes to approve Kaiser's request for a Phase III bond release for <br />the CCM No. 1. <br />Any person with a valid legal interest which might be adversely affected by this proposed decision <br />may request a formal public hearing before the Mined Land Reclamation Board in accordance with <br />Rule 3.03.2(6). Public notice of this proposed decision will be published twice in the Huerfano <br />World for two weeks as soon as possible. Requests for public hearing must be submitted to [he <br />Division in writing within thirty days of the first publication of the public notice. If no hearing is <br />requested, the Division's decision will become final andjurisdiction will terminate at the site. <br />
The URL can be used to link to this page
Your browser does not support the video tag.