My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV93163
DRMS
>
Back File Migration
>
Revision
>
REV93163
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:14:30 AM
Creation date
11/21/2007 11:27:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981024
IBM Index Class Name
Revision
Doc Date
12/1/1999
Doc Name
PROPOSED DECISION AND FINGINGS FOR PHASE III BOND RELEASE
Type & Sequence
SL3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />No comments, written objections, or requests for an informal hearing regarding the bond release <br />application were received by the Division. <br />The Division scheduled and conducted a bond release inspection on October 25, 1999. The site <br />inspection was conducted as required by Rule 3.03.2(2). Jeny Koblitz, of Greystone <br />Development Consultants, Inc. and Mike Keegan of Kaiser Ventures, Inc. were present for the field <br />inspection. The Office of Surface Mining was also informed of the inspection but due to <br />extenuating circumstances, was unable to attend. No other interested parties were in attendance for <br />the bond release inspection. <br />CRITERIA AND SCHEDULE FOR BOND RELEASE <br />PHASEI <br />Rule 3.03.1(2)(a) states, "Up [o sixty percent of [he applicable bond amount shall be released <br />when the permittee successfully completes backfilling, regrading, and drainage control in <br />accordance with the approved reclamation plan." Kaiser received approval for a Phase I bond <br />release for CCM No. 1 in December 1990. <br />PHASE II <br />Rule 3.03.1(2)(b) states, "Up to eighty-five percent of the applicable bond amount shall be <br />released upon the establishment of vegetation which supports the approved post-mining land use <br />and which meets the approved success standard for cover... based on statistically valid data <br />collected during a single year of the liability period". In regard to Phase II bond release, Rule <br />3.03.2(3)(b) also states, "No more than sixty (60) percent of [he bond shall be released so long as <br />the lands to which the release would be applicable are contributing suspended solids to <br />Reclaimed area, main pit disturbance, north and west section <br />
The URL can be used to link to this page
Your browser does not support the video tag.