My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV93124
DRMS
>
Back File Migration
>
Revision
>
REV93124
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:14:28 AM
Creation date
11/21/2007 11:27:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981014
IBM Index Class Name
Revision
Doc Date
9/27/2005
Doc Name
Financial Warranty Review
From
DMG
To
Valco Gunnison Concrete Division
Type & Sequence
SI2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />Task # <br />Date <br />User <br />03a State :Colorado <br />09/27/2005 <br />GRM <br />County :Gunnison <br />Site :Rozman Pit <br />Agency or organization name :OMG <br />Permit or otherjob action :2005 <br />Task description :SprE <br />HOURLY EQUIPMENT COST <br />on 3:1 <br />Basic machine :Cat D8R Series /l - 8SU <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />Horsepower: 310 <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $48.82 NA <br /> Operating cosUhour : $66.09 100 <br /> Ripper op.cost/hour : $0.00 0 <br /> Operator cost/hour : $31.78 NA <br /> Total unit cost/hour : $146.70 Total fleet cosUhour : $146.70 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 2,689 CCY factor : 1.125 volume : 3,025 LCY <br /> <br />Source of estimated volume :accepted 2002 volumes <br />Source of estimated swell factor :program <br /> <br />HOURLY PRODUCTION Jab Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 100 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 852.6 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (ishiff/day) <br />Consolidated stockpile Spoil pile : 0.80 (fnd-rf) <br /> Push gradient : 1.43 (Cat HB) <br />Average push gradient : 20.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 8,900 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,550 Ibs/LCY Net correction : 0.64 <br />Weight description <br />Earth - Drv Docked <br />Adjusted unit production : 546.00 LCY/hr <br />Adjusted fleet production : 546.00 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 5.54 Hours <br />Unit cost : $0.269 /LCY Total job cost : $813 <br />Permitfjob# :M-1981-014 <br />Abbreviation :none <br />Filename : M014-03a <br />
The URL can be used to link to this page
Your browser does not support the video tag.