My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV93124
DRMS
>
Back File Migration
>
Revision
>
REV93124
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:14:28 AM
Creation date
11/21/2007 11:27:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981014
IBM Index Class Name
Revision
Doc Date
9/27/2005
Doc Name
Financial Warranty Review
From
DMG
To
Valco Gunnison Concrete Division
Type & Sequence
SI2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROADABLE EQUIPMEN7 - - -~ "~~ - - -- - ~. <br />Machine Total Fleet Size HaulTri <br />Description P Return Trip <br />CosUhour/unit (No units) ~ CosUhr/fleet ~ CosUhr/fleeT <br />F/afbed truck, 4x2, 30K GVW $52.44 ? 55244 QF9 dd <br />Subtotals <br />EQUIPMENT HAUL DISTANCE and TIME ' <br /> Nearest major city or town within project area region <br />Transportation CVCIe Time • NOn- <br /> Tofal One-way travel distance <br /> Roadable Roadable Average travel speed <br /> Equipment Equipment <br />Haul time (hours) = 0.67 0.67 Total non-roadabfe mob/demob cost' <br />Return time (hours) = 0.67 0.67 • two round trips with haul rig <br />Loading time (hours) = 0.50 NA Total roadable mob/demob cost" <br />Unloading time (hours) = 0.50 NA '• one round tdp, no haul dg <br />Subtotals = 2.33 1.33 <br />JOB TIME AND COST ~ ~~ Total job tlme~: <br />Total job wst <br />Gunnison <br />30.0 <br />45.0 <br />53,118.36 <br />sheet 2 of 2 <br />miles <br />mph <br />
The URL can be used to link to this page
Your browser does not support the video tag.