My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV93105
DRMS
>
Back File Migration
>
Revision
>
REV93105
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:14:27 AM
Creation date
11/21/2007 11:27:38 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981034
IBM Index Class Name
Revision
Doc Date
1/18/1994
Doc Name
STIPULATION 11 REFUSE PILE UPPER DIVERSION DITCH PERMIT C-81-034
From
MINREC INC
To
DMG
Type & Sequence
TR11
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINREC, INC. <br />-~ <br />III IIIIIIIIIIIII III GRAND CJUNCTION,R COLORADO 81 06 <br />sse PHONE: (303) 245-4101, FAX 242-7908 <br />RED CANYON MINES <br />RECEIVED <br />January 14, 1994 <br />C. E. Johnston <br />Division of Minerals and Geology <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />Re: Stipulation No. 11 <br />Refuse Pile Upper Diversion Ditch <br />Permit C-81-034 <br />Dear Ms. Johnston: <br />JAN 181994 <br />Division cf A-iinerais a, ~aciooy <br />Enclosed is an application for a technical revision which will <br />incorporate the design calculations for the refuse pile upper <br />diversion ditch into the permit. The alignment of the new ditch is <br />the same as the diversion ditch that was mistakenly reclaimed in <br />1988. The following revised pages and drawings comprise this <br />application. <br />Page/Drawing Description of Change <br />Table Index Added tables 2.05.3(4)(d)-9 - 12 to index. <br />98 Added paragraph that notes the location in the <br />permit of the design calculations for the upper <br />diversion ditch. <br />100 Added explanation of the design calculations. <br />Tables 2.05.3(4)(d)-9 - 12 Design calculations. <br />2.05.3(4)-2(a) Show refuse pile upper diversion ditch. <br />I anticipate having the diversion ditch constructed no later than <br />the end of July 1994. Please call if you have any questions. <br />Sincerely, <br />//,4,~oTiT.v <br />Jim Stover, P.E. <br />Chief Engineer <br />Enclosures <br />
The URL can be used to link to this page
Your browser does not support the video tag.