Laserfiche WebLink
CIRCES Cost Estimatinst Software <br />SCRAPER , r1Nl V Wr1P1[ <br />PROJECT IDENTIFICATION <br />Agency ar organiza8on name : DMG <br />Task # : 003 State : Co/oratio <br />Date : OBN7l1006 County :Grand <br />User : RMW Slte :Grand Gravel Pit <br />Permit a other job action : Bond recelcua8ion Irom inspection <br />Task description : R@plat@ fOpS01/ OV@I 12 8Cf@S <br />HOURLY EQUIPMENT COST <br />Shift basis : f per day <br />Cost Breakdown : Job uUlizatlon % Horsepower : 365 <br />Ownership tnsUhour: 551,78 NA Weight (UST) : 40.92 <br />OpereBng cosOhour : $94,43 100 Cost data source : (CRG) <br />Operator cosUhour: $24.95 NA <br />Total unit cosOhour: $171.18 Total fleet cosryhour: ;171.18 <br />MATERIAL QUANTITIES <br />IniBal Swell Loose <br />volume: 9,880 LCY /actor : NA volume: 9,880 LCY <br /> <br />Source of quantity fake-off : B inches over 12 acres <br />Source of estlmated swell factor : NA <br />HOURLY PRODUCTION <br />Hauling CaoadN <br />Scraper Payload (weight) Basis : Scraper Bowl (volume) Basis <br />Matedal weight 2,500 poundslLCY SWdt volume: 18.00 LCY <br />Matedal description : Heaped volume : 23.00 LCY <br />Clay -Dry Average volume : 20.50 LCY <br />Rated payload : 5$000 pounds <br />Payload rapadty : 22.00 LCY AdJusted ppadty : 20.$0 LCY "• <br /> <br />Cvde Time (load + haul + spread + return) : Loading Ume : 0.90 minutes' <br /> Maneuver and spreading Ume : 0,70 minutes <br />Travel Ume : • loading nrre per patron pusnqull models <br />Route Distance (feet) Grade (%) Roll. res.(°k) Total res.(go) Velodty (fpm) Travel erne (min.) <br />Haul : 400 8.0 5.0 13.0 502 0.81 minutes •' <br />Return : 400 -8.0 5.0 -3.0 2,774 0.20 minutes •' <br />bevel time adjusle0 /a accelerarwn erM deteleredon at Ind and GUmp ppinU <br />velootlea era mad. altainaEle per toWlresi stance snovm, not average Total cyde Ume : 2,B1 minutes <br />Job Condition Cortection Factors <br />Site altitude (feet) : 7,500 Adiusted Houdv Production <br />Altitude adjustment hector : 1.00 (Cat HB) Unadjusted unit production : 471.37 LCY/Hour''' <br />Jab effidency factor : 0.83 (1 shiR/day) Adjusted unit production : 391.23 LCY/Hour <br /> Adjusted fleet production : 391.23 LCY/Hour <br />Netjob conectlon factor : 0.63 •"zlimes volume on push-pun models <br />JOB TIME AND COST <br />Fleet size : 1 Scraper(s) Total job Ume : 24.74 Hours <br />Unit cost : $0.437 /LCY Total job wst : ,f4 23$ <br />5, <br />Model : Caf 823G <br />Pennif<ob # :M-1998-019 <br />Abbreviatlon :none <br />Filename :M019-003 <br />