My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV92950
DRMS
>
Back File Migration
>
Revision
>
REV92950
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:14:19 AM
Creation date
11/21/2007 11:25:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1974015
IBM Index Class Name
Revision
Doc Date
4/26/2000
Doc Name
SUMMARY OF WMBI COMMITMENTS
Type & Sequence
AM6
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
! • <br />If the property curtently leased to Braly is not mined, Western Mobile will revise the mining and reclamation <br />plan exhibits by applying to the Division for a Technical Revision (TR). (April 20.2000 DMG Adequacy <br />Review Response #3, page 3) <br />I5. Westem Mobile will construct aloes-profile berm along the northern mining limits of the area to be mined <br />between North 51" Street and the South Branch of the St. Vrain at a minimum setback distance of 300 feet <br />south of the South Bank of the St. Vrain Creek. The minimum elevation of the low-profile berm will <br />correspond to the existing ground surface elevations along the boundary between the 100-year flood plain and <br />shallow flooding. (April 20, 2000 DMG Adequacy Review Response #3, page 4) <br />16. Westem Mobile will commit to a minimum mining setback distance of 300 feet from the south bank of the St. <br />Vrain Creek which will eliminate the need for any pitside bank protection. (April 20, 2000 DMG Adequacy <br />Review Response #3, page 5) <br />17. Westem Mobile will commit to a 150-foot minimum crest width for the two internal lateral berms (the interior <br />berm located upstream (west) of the lined reservoir proposed for the southeast comer of the permit area and the <br />embankment of the proposed pond to be located north and west of the cement plant). (April 20, 2000 DMG <br />Adequacy Review Response #3, page 5} <br />I8. In the unlikely event that sand and gravel mining at Lyons results in an adverse impact to adjacent ditches <br />and/or ditch laterals, Westem Mobile will mitigate such impacts with the approval of the affected ditch <br />company and/or the Water Commissioner for the St. Vrain. (Apri120, 2000 DMG Adequacy Review Response <br />#3, page 7) <br />19. The permittee shall install a recharge structure in the area near Hygiene Road along the southern border of the <br />Phase 111 mining area at the time that the permittee is preparing to mine the Phase III area or earlier should the <br />permittee so chose. The permittee shall maintain and operate the recharge structure at all times during the <br />mining and reclamation of Phase III as necessary to minimize impacts on the prevailing hydrologic balance in <br />the groundwater system servicing wells in areas outside the Phase III mine area as provided in rule 3.1.6(1). <br />The permittee shall provide an itemized cost for the installation of the recharge structure in Exhibit L, <br />Reclamation Costs. (April 25, 2000 Massey Semenoff Stem & Schwarz, P.C.) <br />
The URL can be used to link to this page
Your browser does not support the video tag.