Laserfiche WebLink
Bowie No. 2 Mine (Permit No. C-1996-083) <br />Technical Revision No. 30 <br />Stipulation No. Description <br />14. AN ACCEPTABLE SHRUB PLANTING PLAN AND WOODY <br />PLANT DENSITY STANDARD MUST BE SUBMITTED BY BOWIE <br />RESOURCES LIMITED. THE PLANTING PLAN AND DENSITY <br />STANDARD MUST BE DEVELOPED IN CONSULTATION WITH <br />THE COLORADO DNISION OF MINERALS AND GEOLOGY AND <br />THE COLORADO DNISION OF WILDLIFE. <br />16. THE OPERATOR WILL DETERMINE SITE-SPECIFIC <br />CHARACTERISTICS (MOIST UNIT WEIGHT) AND STRENGTH <br />PARAMETERS OF COHESION AND ANGLE OF INTERNAL <br />FRICTION OF COAL PROCESSING WASTE MATERIALS WHEN <br />THE FIRST BENCH OF THE GOB PILE NO. 2 REACHES HALF TO <br />THREE/FOURTHS THE DESIGN HEIGHT, AND DEMONSTRATE <br />TO THE DIVISION THAT THE PROPOSED FILL, AS APPROVED, <br />WILL BE STABLE WITH A MINIMUM FACTOR OF SAFETY OF <br />1.5. <br />17. ATTACHED TO THE APPROVAL OF TECHNICAL REVISION NO. <br />30 ARE THE FOLLOWING: <br />1) NO DISCHARGE FROM POND F IS ALLOWED UNTIL THE <br />OPERATOR SUBMITS TO THE DNISION THE NPDES PERMIT <br />THAT INCLUDES THE OUTFACE FOR POND F; <br />2) NO CONSTRUCTION PROPOSED IN TR-30 IS ALLOWED UNTIL <br />THE OPERATOR SUBMITS TO THE DNISION THE AIR <br />EMISSIONS PERMITS FOR THE PREPARATION PLANT <br />SYSTEM AND GOB PILE N0.2; <br />3) NO IMPOUNDMENT OF WATER IN POND F IS ALLOWED <br />UNTIL THE OPERATOR SUBMITS DOCUMENTATION OF THE <br />SUCCESSFUL RESOLUTION OF THE SECTION 7 <br />CONSULTATION WITH THE U.S. FISH & WILDLIFE SERVICE; <br />4) NO SECTION OF THE DEER TRAIL DITCH CAN BE DNERTED <br />THROUGH A CULVERT UNTIL THE OPERATOR SUBMITS TO <br />THE DNISION DOCUMENTATION OF THE APPROVAL FROM <br />THE DEER TRAIL DITCH COMPANY. <br />