My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV92904
DRMS
>
Back File Migration
>
Revision
>
REV92904
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:14:16 AM
Creation date
11/21/2007 11:25:39 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
9/29/1997
Doc Name
TECHNICAL ADEQUACY TR-43 C-81-019
From
DMG
To
COLOWYO COAL CO
Type & Sequence
TR43
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
James A. Kiger <br />29 Sep 97 <br />Page 5 oj6 Pages <br />productivity estimates for pond regrading. <br />14. In reviewing the equipment mobilization and demobilization estimate, we noted the <br />following: <br />a. Colowyo did not include ownership costs for the equipment while it is in transport. <br />b. Revegetation equipment was not included in the estimate. <br />c. A crane for facilities demolition was not included. Based on the amount of <br />demolition, CDMG suggests mobilization of 2 cranes. <br />d. Costs for mobilization and demobilization of site maintenance equipment (dozer and <br />revegetation equipment over ten years) was not included. <br />e. The 777C haul trucks and D I ON dozers require two haul rigs for transportation. <br />Colowyo based the estimate on one rig per equipment unit. <br />Please revise the estimate to address these comments. <br />15. The light plant equipment costs on page D-28 appear to be in error. It appeazs that the unit <br />cost used is for one light plant, and not eight. Please verify the costs. <br />16. In addition to the CDMG administrative costs estimated by Colowyo, CDMG would incur <br />costs to prepare bid documents, hold pre-bid meetings, etc. Please revise the estimate to <br />include an additional 3 months CDMG time (without vehicle or per diem). <br />17. Since our 1991 estimate, CDMG has learned that our previous estimates for site maintenance <br />costs are inadequate. Our observation at a recently reclaimed large surface mine is that <br />maintenance took weeks to complete. Please revise the estimate based oo Colowyo's <br />experience with annual maintenance requirements. <br />I8. The estimate needs to include (as in the 1991 estimate) the costs of backfilling, grading, <br />topsoil redistribution and revegetation of the Section 1 l Pit until, respectively, Phase I, II and III <br />bond releases are approved. Phased release of bonds is described in Rules 3.03(2)(a) and (b). <br />Bond releases may be approved for areas that have been disturbed and subsequently backfilled <br />and graded (Phase I) and topsoiled and seeded (Phase II). We are in receipt of your letter of <br />September 24, 1997, Re: Application For Phase I Bond Release on 1987-1995 Reclaimed Areas <br />Colowyo Coal Company, L.P. (C-81-019) (Application) for Phase I bond release of this, and <br />other, areas. An option available is to waive your right for a decision on this bond calculation <br />(TR-43) action until a decision is reached on your Phase I Bond Release Application. Should <br />