-z- <br />The topographic survey of the regraded area showed a site sloping to the <br />northwest with the lower, northern slopes ranging from 13.7% to 16.1 A. <br />The approved Reclamation Map showed similar slopes of 14,7p to 18.5, <br />suggesting that Native had achieved a mild reduction of slope in that <br />area. On the other hand, this reduction was probably attained through a <br />mild oversteepening of the upper portion of the pit. The upper half of <br />Utie regraded pit nad slopes ranging from 11 ,3b to 12.30 while the <br />approved Reclamation 14ap showed a slope of 9.8`5. A small ridge was <br />constructed in the center of the mined out Pit 4 area td achieve blending <br />between the previously reclaimed area and the 1990 reclaimed area. A <br />minor Swale was observed to the northeast of the ridge. While Lhe site's <br />general configuration differs mildly from the approved configuration, the <br />Division's assessment, prior to completion of reclamation activities at <br />the site, is that bacf:filliny of the open portion of Pit 4 was done <br />according to the reclamation plan. <br />The western portion of the disturbance was surveyed to assess Pond 4's <br />configuration and the slope east of the pond. The top of the slope is <br />crowned by a triangular tupsoil pile 500' long and 8' high. The area <br />sloping to the pond has no topsoil and has not yet been worked in 1990. <br />Currently slopes of 50-55~ drop down to the pond whereas the approved <br />Reclamation Map shows slopes of 17`5. Rockcastle has indicated that a <br />plan is torthcoming to perform backsloping in this area to achieve <br />approximate original contour. <br />The shop buildings were removed early this Sumner. The metal buildings <br />were taken from the site and the unreinforced concrete pad was rubblized <br />and pushed into the pit. Drainage culverts are the only remaining <br />structures at the mine and many of them will be pulled out per IV(3) of <br />the June 27, 1990 Agreement. <br />The remaining reclamation work at the site is of low to moderate <br />difficulty. Outstanding reclamation projects include: <br />1. Completion of topsoiling at the sits. ,, <br />2. Revegetation of regraded areas in Pit 4, including the shop area <br />and areas of overburden and topsoil stockpiling pursuant to II(3) <br />of the Agreement. <br />3. Reclamation of of sediment ponds 2, 3, 4 and 5/6 pursuant td <br />III(2). <br />4. Stabilization measures at Pits 5 and 6 pursuant td IV(i), <br />5. Stabilization of roads pursuant to I(2) and as modified by IY(2). <br />6. Removal of sediment control structures per IV(3) and <br />re-establishment of sediment control structures per IV(4). <br />7. Sealing and reclamation of spoils monitoring well. <br />