Laserfiche WebLink
• • • The existing Castle Concrete Company's Sand Pit will be back£illed to an average of about <br />1/3 of its existing depth. This will be accomplished through the use of washing fines and non- <br />decomposable construction wastes (broken conQete, bricks, etcJ. <br />• • • • Through an agreement already reached, an aquifer recharge system will be installed on the <br />east side of Academy Boulevard. This system will utilize water from the irrigation ditch to help <br />replenish the aquifer. <br />• • • All drainage from the site will be coordinated with the regional drainage system. The <br />currently proposed regional drainage plan includes detention/retention ponds that will provide <br />drainage control for this site and much of the surrounding land. At least one of these ponds (and <br />probably two) are to be constructed on this property and will remain after the operation is completed- <br />• • • The eventual land use for this site is proposed as rangeland wildlife, but the actual plan <br />calls for revegetation of the disturbed land which will be configured in such a fashion that it can <br />easily be converted to recreational, residential, or industrial uses. Because of the long life of this <br />operation, a precise final land use cannot be offered. The desire is to reclaim the land in such a way <br />that future residents can easily decide at that time what the land should be used for. The <br />reclamation of this site is designed around a flexible final land use plan, rather than a plan that is <br />precisely defined as to its final land use. <br />• <br />i <br />Introduction/Overview Page 1/O~ <br /> <br />