Laserfiche WebLink
Mr. Dan Matbemr <br />Dinirion ofMineratr and Geology <br />Page 1 <br />The attached information addresses the revised mining plan (without the Highwall Miner) and the revised ba lline <br />and grading schedule. SCC has taken another look at the postmining topography, based on comments and concerns <br />voiced by the Division in the past Additional updates are provided to organize the PAP into a more comprehensive <br />document prior to application fox Phase I/II bond release and include: <br />• Tab 1, Permit Summary -the permit history has been updated <br />• Tab 2, General Policies -the list of preparers has been updated <br />• Tab 12, Coal Resource Recovery Plan -the text and map has been revised to reflect to new life-of--mine plan. <br />• Tab 13, Facilities - Postmine channel design and documentation Eor the south area has been included. <br />• Tab 19, Reclamation Schedule -teat updates and map including variance requests and scheduling revisions have <br />been developed. <br />• Tab 20, BackSlling and Grading-rest discussions and revisions to maps have been made. <br />• Tab 21, Minesoil Reconstruction -Teat updates and map revisions have been made to reflect new reclamation <br />schedule. <br />• Tab 22, Revegetation Plan -Text updates were provided in TR-50, however the Postmine Vegetation Map has <br />been updated in this revision. <br />• Tab 25, Bonding -the text has been updated <br />If the Division has further questions ox comments, please contact me @ (970) 276-5217 ox (970) 84G-3648. <br />Sincer_ ely, \ _J <br />(`11th; ,JA.I ) <br />nll <br />/'o! / t0la ~prO <br />Roy A. Kazo <br />Reclamation Manager <br />Seneca Coal Company <br />enclosure(s) <br />cc John Husband (BI.M) <br />Cazl Johnston (OSMRE) <br />