Laserfiche WebLink
road ditches, berms, and culverts, as well as the potential for additional off-site <br />sedimentation. These concerns would need to be addressed, and the reclamation cost <br />estimate would need to be increased as appropriate. <br />17. B seam coal analysis sheets (Table V-I) are included on page V-3 and V-4 of the <br />amended application. They would seem to more appropriately fit afrer page V-17, where <br />there is a reference to the Table. <br />18. Narrative regazding pond spillway swctures on page V-12 needs to be amended to <br />accurately describe the approved structures for the refuse azea sediment ponds. <br />