Laserfiche WebLink
RECLAMATION COST SUMMARY eont'd <br />TOTAL DIRECT RECLAMATION COSTS laubtota le A through P): 55,850,373 <br />II. INDIRECT LUSTS <br />A. LUNTAACI9R'S OVERHEAD i PROFIT <br />Item p~ <br />______ Item Description <br />___________________________________ <br />__________ ~ <br />_______ Co8[ I$) <br />____________ <br />I <br />1. ~ Public Liability Insurance..... 1.550! of directs 590,679 <br />~2. ~ Cont ractor'8 Performance Bond.. 0.8604 of direct 550,313 <br />3. ~ Cont raccor'8 Proti[............ 10.00k of direct $585,027 <br />4. ~ <br />_______ Job Superintendent.. <br />___________________________________ <br />__________ ~ <br />________ 595,242 <br />____________ <br /> Subtot al (AI: $821,261 <br />TOTAL CONSTRUCTION CONTRACT AMOONT (direct plus 0 L P1: • 56,671 573 <br />B. DMG PROJECT ADNIN ISTRATION EXPENSES <br />Item tl~ Item Descrip[Son ~ CoeG 151 <br />._____I______________________________________________________~_________ <br />1. ~ Project engineering Eees at.. .. 4.25! of ent r. ~ 5283,540 <br />2. ~ Staff admin. expense 0.754 of Intr. ~ 550,170 <br />________________________________________________________________________ <br />Subtotal (B1: 5333,710 <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A Chrough B): 51,154 971 <br />NE7 INDIRECT OUST PERCENTAGE: 19.74! <br />TOTAL PERFORMANCE BOND AMOUNT (DIRECT plus INDIAECC costal: 57,005,29] <br />III. BOND STATUS -- BOND RELEASB SUMIARY <br />No bond releases have been granted <br />sheet 10 of 10 <br />