Laserfiche WebLink
RECLAMATION COST SIA4IARY cont'd <br />I. EARTHNOAX - DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Taek p~ <br />______I Task Description <br />____________________________________________________ ~ Cos[ f51 <br />___-_______. <br />39 ~ Regrade pond AP-1 I <br />~ $5,639 <br />40 ~ Regrade pond RP-2/3 ~ 55,765 <br />91 ~ Regrade pond RP-4 ~ $5,396 <br />42 ~ Aemwe Scullion Culch and loadout rock check dams ~ $7,686 <br />43 ~ Regrade pond ~ $67 <br />N/A ~ Remove SDH ponds - Incl. Task p12 <br />N/A ~ Remove flor cello - Incl. Taak pl7 <br />N/A ~ Pond DP-1 included in Task p23 <br />N/A ~ Slot Storage pond included~in Task pB ~ <br />N/A ~ Loadout ponds included in Tasks p3, p4, and M24 ~ <br />N/A ~ Ventilation entry pond included in Taek p7 <br />N/A ~ Halandras landfill pond included in Task pll ~ <br />94 Regrade Pond Sd ~ 53,907 <br />Subtotal (11: $26,155 <br />sheet 5 of lD <br />