Laserfiche WebLink
<br />June 8, 1990 <br />Page 3 <br />DIVISION OF WILDLIFE CONCERNS <br />1. On May 21, 1990 Division of Wildlife representati <br />Goforth and Jim Jones met at the Alma Placer with Jol <br />and Herb Hendrix, representatives of Reclamation ] <br />Inc. Measurements were made and methods were di: <br />mitigate potential erosion from two areas of the F <br />berm and sedimentation to the Middle Fork of the Soi <br />River. The two areas were (1) where the berm is a< <br />the Middle Fork of the South Platte River and (2) <br />berm is adjacent to wetlands area vegetation <br />directions from area (1). <br />The DOW is satisfied with the plan jointly arrived a <br />No. (1). The simple diagram of this plan that you <br />included with your last response could not be found. <br />reference to detailed plans yet to be submitted <br />include the detailed plan and diagram with your ri <br />June 8, 1990. <br />s Bruce <br />Schmuck <br />OVYIVG`l, <br />ussed to <br />nd No. 1 <br />h Platte <br />acent to <br />here the <br />in both <br />for area <br />ated was <br />You made <br />Please <br />?onse by <br />The DOW is also concerned about area No. (2) and w nts to be <br />assured that erosion and sedimentation will not oc ur there. <br />RRI has not committed to protecting this portion of the berm. <br />Prior to this time the MLRD was not as concerned abo t erosion <br />and sedimentation from this area. We felt that the egetation <br />between the berm and the stream would trap eroded ma erial and <br />prevent most of it from reaching the stream. Howeve , the DOW <br />feels that the wetlands vegetation could be damage and that <br />sediment could reach the stream. Since this would onstitute <br />off site damage and could constitute a violation, the MLRD <br />agrees that this area should also be protected. An cceptable <br />compromise would be to provide mechanical protection of all <br />areas outside of the areas to be rip-rapped ra her than <br />completely revegetating these outslopes. This echanical <br />control could be accomplished with jute erosio control <br />blanket, excelsior mat or a similar method tat would <br />stabilize the slope for the 2-3 year period befo a grading <br />occurs. Please state clearly what commitments RRI will make <br />to stabilize the berm. <br />Pursuant to your request, the configuration of "area Rio. 1" is <br />provided in the attached report. <br />For "area No. 2", RRI points out that in a letter from t e MLRD to <br />the DOW dated April 18, 1990, the MLRD concluded that dditional <br />erosion control is not necessary because of the "buffer f shrubs, <br />grasses, and forbes on the gentle slopes between the be and the <br />stream". RRI agreed with that conclusion. <br />