Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
Revision
Doc Date
8/23/2006
Doc Name
Revised Cost Summary
From
Susan Burgmaier
To
Joe Dudash
Type & Sequence
MR27
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />HYDRAULIC EXCAVATOR WORK <br />Task # : 002 <br />Date : 08/11/2006 <br />User: SLB <br />Agency or organization name : CDRMS <br />State :Colorado <br />County :Gunnison <br />Site :Bear No. 3 <br />Permit or other job action :2005 Midterm and MR 27 <br />Task description : BacMill and regrade F <br />HOURLY EQUIPMENT COST <br />bench and access road <br />L_ <br />Machine description :Cat 325C L <br />Horsepower: 140 <br />Weight (MT) : 28.18 <br />Cost Breakdown : Utilization <br />Ownership cosUhour : $39.14 NA Shift basis : 1 per day <br />Operating cosUhour : $47.26 100 Data source : (CRG) <br />OperatorcosUhour: $32.96 NA <br />Total unit cosUhour : $119.36 Total fleet cosUhaur : $119.36 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 7, 932 LCY factor : NA volume : 7,932 LCY <br />Source of estimated volume :Operator estimate <br />Source of estimated swell factor : NA <br />- - ---- ------------ .___.--- y; <br />HOURLY PRODUCTION <br />Excavator Cvcle Time (load bucket. swing loaded. dump bucket. swing emori) <br />Basic job condition description <br />Secondary job condition within basic description <br />Cycle time value <br />Bucket Caoaciri <br />BELOW AVERAGE <br />AVERAGE <br />0.34 minutes <br />Rated bucket capacity : 2.22 LCY (heaped) Bucket size class : medium <br />Bucket fill factor : 0.85 Hard, tough clay (80% - 90%) <br />Adjusted bucket capacity : 1.89 LCY <br />Job Condition Correction Factors Source <br />SRe akitude : 6,000 feet Akitude adjustment : 1.00 (Cat HB) <br /> Job effidency adjustment : 0.83 (1 shilt/day) <br /> Net job correction : 0.83 multiplier <br /> <br />Unadjusted houdy unit production : 337.97 LCY/hour <br />Adjusted houdy unit production : 280.52 LCY/hour <br />Adjusted hourly fleet production : 280,52 LCY/hour <br />JOB TIME AND COST <br />Fleet size : 1 excavator(s) Total job time : 28.28 hours <br />Unit cost : $0.426 per LCY Total job wst : $3,375 <br />_.___.__~___~__._J___-___ __ __ ___ __ ___ __. __ ___ _~ll_L~_:~.___l1_~:. <br />Permitlob # : C-1981-033 <br />Abbreviation :none <br />Filename : C033-002 <br />