My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV92589
DRMS
>
Back File Migration
>
Revision
>
REV92589
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:14:00 AM
Creation date
11/21/2007 11:23:03 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Revision
Doc Date
12/5/1997
Doc Name
ROADSIDE PORTALS PN C-81-041 PROPOSED DECISION PR APPLICATION NO 2
From
DMG
To
POWDERHORN COAL CO
Type & Sequence
PR2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />' RESOLVED BY REPRESENTATIVES OF DOW, PCC, AND DMG <br />AT THE MINE ON AUGUST 8, 1997•. <br />18. WITHIN 180 DAYS OF FINAL APPROVAL OF PR-02, THE <br />PERMITTEE WILL SUBMIT APPROPRIATE CERTIFICATION <br />STATEMENTS OF RELEVANT SHOWING STATEMENTS [N LIEU <br />OF CERTIFICATION FOR HAUL ROAD SEGMENTS AND ACCESS <br />ROAD SEGMENTS NOT WITHIN THE DISTURBED AREA, TO <br />COMPLY WITH RULES 4.03.1(1)(d)(i), 4.03.1(1)(d)(ii), <br />4.03.2(1)(~(i), OR 4.03.2(1)(t)(ii), AS APPLICABLE, <br />19. WITHIN 180 DAYS OF FINAL APPROVAL OF PR-02, THE <br />PERMITTEE WILL SUBMIT DESIGNS FOR A STABLE <br />PERMANENT CHANNEL TO BE CONSTRUCTED IN <br />ASSOCIATION WITH FINAL RECLAMATION OF THE RSRDA, <br />WHICH WILL SAFELY CONVEY FLOW FROM DRAINAGE AREA <br />121-1 TO THE BASE OF THE RSRDA. <br />20. WITHIN 180 DAYS OF FINAL APPROVAL OF PR-02, THE <br />PERMITTEE WILL COMPLETE CONSTRUCTION OF THE <br />PROPOSED 100 YEAR DIVERSION ALONG LIGHT USE ROAD 1 <br />AND SUBMIT A QUALIFIED REGISTERED PROFESSIONAL <br />ENGINEER'S CERTIFICATION THAT BOTH THE LIGHT USE <br />ROAD 1 DITCH SEGMENT AND THE SOUTH DNERSION DITCH <br />HAVE BEEN CONSTRUCTED IN ACCORDANCE WITH ALL <br />APPLICABLE PERFORMANCE STANDARDS AND DESIGN <br />CRITERIA. <br />21. A COPY OF THE FINAL AIR EMISSION PERMIT FOR CRDA-1 <br />WILL BE SUBMITTED TO THE DNISION UPON ISSUANCE. A <br />COPY OF THE AIR EMISSION PERMIT FOR CRDA-3 WILL BE <br />SUBMITTED TO THE DNISION PRIOR TO INITIATION OF <br />WASTE DISPOSAL AT THE SITE. <br />22. AT LEAST 120 DAYS PRIOR TO INITIATION OF COAL <br />EXTRACTION WHICH COULD POTENTIALLY CAUSE <br />SUBSIDENCE DAMAGE TO THE 345 KV RIFLE-SAN JUAN <br />POWERLINE, THE PERMITTEE WILL SUBMIT WRITTEN <br />STATEMENTS FROM THE OWNERS OF THE POWERLINE <br />WHICH INDICATE THAT POTENTIAL WORST CASE <br />SUBSIDENCE DAMAGE TO THE POWER LINE COULD BE <br />REPAIRED WITHOUT DISRUPTION OF SERVICE. <br />
The URL can be used to link to this page
Your browser does not support the video tag.