My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV92493
DRMS
>
Back File Migration
>
Revision
>
REV92493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:13:55 AM
Creation date
11/21/2007 11:22:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984065
IBM Index Class Name
Revision
Doc Date
1/14/1997
Doc Name
PROPOSED DECISION FOR APPROVAL OF PERMIT RENEWAL
Type & Sequence
RN3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~ <br />`" COL~O DIVISION OF MINEIL~.S AND GEOLOGY <br />!',, ~~.' 1313 Sherman Street, Room 215, Denver, Colorado 80203, (303) 866-3567 <br />...._~-..._..__._.....-..._~...._._._....._._..._....._...___.Y.._.__...._.._ <br />PROPOSED DECLSION III IIIIIIIIIIIII I <br />for <br />Approval of Permit Renewal <br />The Colorado Division of Minerals and Geology, in accordance with C.R.S. 34-33-109(7), <br />proposes to approve with conditions the renewal of a permit to conduct surface coal mining and <br />reclamation operations at the Coal Ridge No. 1 Mine, Permit No. C-84-065. <br />This decision is based on a review of the complete and accurate application and the existing <br />permit, including all conditions and revisions approved up to January 10, 1997. In accordance <br />with C.R.S. 34-33-109(7)(a), the Division makes the following determinations which warrant <br />that the permit be renewed: <br />1. The terms and conditions of the valid, existing permit aze being satisfactorily met; <br />2. The present surface coal mining and reclamation operation is in compliance with all <br />requirements of the Colorado Surface Coal Mining Reclamation Act, C.R.S. 34-33-101 <br />et seq., and the Regulations promulgated thereunder; <br />3. The renewal requested does not substantially jeopardize the permittee's continuing <br />responsibility on existing permit areas; <br />4. The operator has provided evidence that the performance bond in effect for the <br />operation will continue in full force for the proposed period of renewal as well as any <br />additional bond required; <br />5. Any additional revised or updated information as required has been provided. <br />Based on a preponderance of the evidence, the permit issued to NCIG Financial, Inc. meets the <br />requirements under the right of successive renewal. <br />The permit application will remain a binding part of the permit. Renewal of the permit will be <br />for a term of five (5) years. <br />I conclude that there is no basis for denying the renewal. <br />DIVISION OF MINERALS AND GEOLOGY <br />~~~~.'~~v C~ <br />Director Date <br />M:\OSSU RC\TEM P\C RN 15B65.SLB <br />
The URL can be used to link to this page
Your browser does not support the video tag.