Laserfiche WebLink
EXHIBIT L <br />RECLAMATION COSTS <br />Presently, it is estimated that reclamation costs should not exceed $5000.00 at the <br />proposed expanded permitted azea. This is because of the cost of fertilizer, re-seeding <br />operations, and labor. It is anticipated that the costs of grading and disseminating topsoil <br />and overburden will not be that great. <br />