Laserfiche WebLink
iii iiiiiiiiiiiiiiii <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: 1303) 866-3567 <br />FA%: (303) 8328106 <br />~I~~~ <br />DEPARTMENT OF <br />NATURAL <br />RESOURCES <br />Roy Romer <br />Governor <br />DATE: May 22, 1995 <br />TO: Barbara Pavlik d/,,Erica Crosby <br />From: Dan Mathews ~~/~, <br />RE: Midterm Reviews for Roadside Portals <br />Munger Canyon Mine (C-81-020) <br />dames 5. Lochhead <br />E*eNlive Director <br />Michael B Long <br />Diva stun Director <br />(C-81-041) and <br />The Roadside Midterm is due July 5, 1995 and the Munger Canyon <br />Midterm is due July 14, 1995. I am requesting that each of you <br />review the following requirements, for each operation: <br />Erica <br />2.05.4(2)(b) Reclamation cost estimate <br />3.02.2(4) Bond amount and terms of acceptance <br />2.05.3(4) Ponds, impoundments, and diversions <br />Barbara <br />2.04.5 General Description of Hydrology and <br />Geology <br />2.04.6 Geology.Description <br />2.04.7 Hydrology Description <br />2.05.6(3) Protection of Hydrological Balance <br />2.06.8 Alluvial Valley Floors <br />I would like to have your Roadside comments by June 30, and Munger <br />comments by July 10. Let me know if you have any questions. <br />Erica, let me know ASAP how much site verication (per the new bond <br />compliance inspection policy) you need from me for the reclamation <br />cost estimates. Thanks. <br />cc: Larry Routten <br />c:\041mdtrm.dtm <br />