Laserfiche WebLink
Costilla County <br />Limited Review Permit Application <br />NOTE: (Jfapplicmit is not the owner oftiu property, then a copy oja cantmct for sale or lease between applicant and <br />owrrer, or a rromrized leaer jtrnn the owner rnnrenting to this application, mast 6e suhrnitted). <br />APPLICANT: Costilla Co <br />TELPHONE: b / t- S:s / L FAX: <br />LEGAL DESCRIPTTON OF LAND: (Attach acopy of dtxdand/or survey plat) <br />See Attachment <br />Common Location ofPropcrty: (SI/2) Section 28. Township 3 N. Ranee 73 W <br />Limited Use Review Information <br />Note: A Limited Use Review may be permitted maybe eatnhl~nluYt in a zoning district only after review by the <br />planning commission, mmd subject to the conditions set forth in mm approval of the use by the Cwnmisaion. <br />Submitia! Regairemeuts: <br />1. Application form and Fee <br />2. Vicinity Map <br />3. Site Plan <br />4. Refertai Packets <br />5. Development Report & Agreement <br />What kind of land use project ie being proposed? Grave 1 P i t <br />What is the tw~mnt zmring th:sigoadon the parcel2 A g r i c u l t u r e <br />(The use must comply with the minimum requirements of [he zoning district in which the use is to be established.) <br />Does your proposal comply with the intent and purposes of the Costilla County land Use Code? ~~_ <br />Is yotu proposal harmonious with rho surrounding neighborhood? What effect will it have on the <br />neighborhood? N o E f f e c t <br />What is the anticipated timefiame for completion of tfie proposed use 7 A t )v e a s t Z 5 Year s <br />Will your project be done in phases? © N <br />If so please list phases and timeframe for each phase. 6 phases 2- 3 y e a r s e a c h <br />Phase is time period <br />Is a Site Plan attached? I' N (A site plan of the proposed project is required with this application) <br />Applicant <br />Date: 3-.2 v • v i <br />nAte: `3~ ZY-!7 ~ <br />Castilla <br />