My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV92376
DRMS
>
Back File Migration
>
Revision
>
REV92376
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:13:49 AM
Creation date
11/21/2007 11:20:46 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Date
7/26/1989
Doc Name
MT GUNNISON 1 MINE TR 55 FN C-80-007
From
MLRD
To
OSM
Type & Sequence
TR55
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />STATE OF COLOI~IIIIIIIIIIIII III <br /> <br />Roy Romer, Govei <br />DEPARTMENT OF NATURAL RESOURCES <br />MINED LAND RECLAMATION DIVISION <br />FRED R. BANTA, Dir~etor <br />July 26, 1989 <br />Mr. Dave Maxwell <br />Office of Surface Mining Reclamation and Enforcement <br />Western Technical Office <br />1020 15tH Street <br />Denver, Colorado 80202 <br />RE: Mt. Gunnison No. 1 Mine, TR 55, File C-80-007 <br />Dear Mr. Maxwell: <br />Foilowing is a summary of the B-seam revision and otner pertinent information <br />as you requested. The Mt. Gunnison Mine began producing coal in 1982 from the <br />F-seam. Full production using a continuous miner has averaged approximately <br />500,000 tons per year from undermining approximately 900 acres of the 4276 <br />acre permit area. The permit area generally lies south of Highway 133 and <br />north of the Minnesota Creek drainage divide. <br />B-seam Mine Plan <br />In April, 1989, the applicant applied to the Division and received approval to <br />oegin mining in the B-seam. Approval of the revision was granted July 12, <br />1989. Access to the B-seam will oe accomplished through the construction of <br />two north-south ramps, and a ventilation shaft in the SW 1/4 of Section 21, <br />T13S, R90W from the F-seam to the B-seam, 390' below. Initially, room and <br />pill-ar mining will be performed with a continuous miner. This work will be <br />done in a manner to develop panels for later removal using longwall methods, <br />and to produce as much as 1.4 million tons per year. This revision does not <br />entail any additional surface disturoance since all access and ventilation <br />fac11it1es wi'Il be contained within the F-seam workings. The permit area has <br />been increased, However, by 35.5 acres to accommodate the B-seam mine main <br />access entries. <br />Long-range plans propose mining of the intervening E-seam south of the ramps, <br />following extraction of the B-seam. Tne E-seam lies 180-200 feet below the <br />F-seam and 200 feet above the B-seam. The 1989 mine plan permitting action <br />covered the B-seam exclusively. <br />Once the access ramps and ventilation shaft has been completed the B-seam main <br />w111 be driven to the west. Bleeder entries will be driven to the north and <br />then west to define the mining block antl 8 panels. These panels would then be <br />extracted by a retreating longwali. This block is anticipated to be mined out <br />by 1999. See Exnibit 3.4.A.I. <br />215 Centennial Building, 1313 Sherman Street Denver, Colorado 80203-2273 Tel. (303) 866-3567 <br />
The URL can be used to link to this page
Your browser does not support the video tag.