Laserfiche WebLink
<br />RECLAMATION COST SUMMARY cont'd sheet 3 of 4 <br />H. EARTNNORK - STREAM CHANNEL RECONSTRUCTION <br />Task No.~ Task Description ~ Cost (S) <br />Subtotal (H): <br />I. EARTHYORK - DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Task No.~ Task Description ~ Cost (f) <br />Subtotal (I ): <br />J. EARTXNORK - TOPSOIL/SUBSOIL REPLACEMENT <br />Task No.~ Task Description ~ Cost (f) <br />12 ~ Replace topsoil on drill pads 8 assoc. roads ~ (67,404 <br />13 ~ Replace topsoil in Piceance facilities area ~ f10,019 <br />14 ~ Replace topsoil on Piceance Site main access road 520,094 <br />15 <br />16 <br />18 <br />24 <br />Replace topsoil on Nell field service road ~ <br />Replace topsoil at test mine facility ~ <br />Replace soil a Yellow Cr. Jeep Trail reali grment ~ <br />Replace soil, laydoNn area n. of Piceance FeciLit~ <br />515,264 <br />f12,0% <br />54,830 <br />f6,418 <br />Subtotal (J): (136, 125 <br />