Laserfiche WebLink
~RECLA?1ATION COST S~iAR1' cont'd • sheet 3 of 4 <br />H. EARTHWORK - ST°.E~1^i CHA\\EL RECONSTRCCTIO\ <br />Task No.; Tasl: Description Cost (S) <br />,. <br />. <br />Subtotal (H): <br />EART}14:OR1: - SEDIMENT POND/DIVERSION DITCH/CHECK DAM REMOVAL <br />Task No.; <br />. <br />) <br /> <br /> <br />Tasl: Description Cost (S) <br /> <br /> <br /> <br /> . <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotal (I): <br />E:IRTHWORK - TOPSOIL/SUBSOIL REPLACE?;ENT <br />Task No.; Task Description <br />2 Topsoil Replacement 4 acres <br /> <br />Cost (S; <br />S6-i6 <br /> <br />Subtotal (J): SG4S <br />