Laserfiche WebLink
J. J. Dudash - 7 - August 13. 2003 <br />The following revised permit pages and maps are enclosed. <br />Pages/Mans Discussion <br />Volume I <br />2.05-19~J 27, 2.05-39~J 45i <br />Volume II <br />15 Mine Facilities, Sheet 2 of 4 <br />16 Haul Road Plan & Profile <br />18 Postmining Topography <br />21-1 Drainage Plans -Sheet 1 of 4 <br />21.2 Drainage Plans -Sheet 2 of 4 <br />26 Previously Disturbed Areas <br />Volume III <br />Tab 8 Protection of the Hydrologic Balance, Pages Exh8-27~J 29i, 40, 191 ~ 196 <br />Tab 9 Four page biological opinion. <br />Volume VII <br />Tab 10 Geotechnical Engineering Report, Coal Preparation Facility, August 11, 2003 <br />Geotechnical Engineering Study, B-Seam Portal Bench, July 30, 2003 <br />Please call if you have any questions. <br />Sincerely, <br />~E~ <br />J. E. Stover, P.E. <br />Consulting Engineer <br />cc: Wm. A. Bear, Jr. <br />