Laserfiche WebLink
o rues n~ evsLrc coxeoxwnoN <br />ALL RIGtrrS RFSERVID 18 ~ 12, 12-9~ FWe <br />Page 103 <br />Constmcdon MazeriaLs Rule 6 <br />cost for fem'liztr, seed and mulch acquisition and application must <br />be provided as cost per acrt. <br />(2) Equipment costs must include such factors as equipment <br />operator wages and benefits, fuel and lubricant consum:Qtion and <br />depreciation. The cost to mobilize and demobilize the equipmerrt from the <br />Hearts[ population comer should be estimated. <br />(3) All items referenced in the Reclamation Plan must be <br />Included in the cost calculation. These items iH addition to earthwork, such <br />as budding demolition, fencing, monitoring well sealing or stream channel <br />secaastrtrction must also be inchrded in the reclamation cost estimate. <br />(4) After the ditto costs noted above have been esfanated, the <br />O&cc may add yr to an additional ma~timum eighteen wadone-ha{f (18.5 ~) <br />pcrccm of that total, which includes private contract, typical ovedrsrd vests. <br />This additional cast is rtgaired to cover indirect costs that an independent <br />contsactor would incur whin performing rrrlam~tion of the sits. Five <br />(596) peteeuR additional cost shall be addod to cover Office administration <br />cost in the evem of bond foziei~e wad permit revocation. <br />635 EJi~1T E -Mau <br />(1) Ia addition to the requirements of 6.2.1.(2), the <br />operator~AppIicam must provide a map that clearly descn'bes the feanrres <br />associated with the mining plan and the componcros of the Reclamation <br />Plea. Include one map for the mine plan wad one map for the Rexlamatioa <br />Plan. The map(s) must be drawn to a scale m smaller than appavpriate to <br />clearly show all elemems that art rtquirtd to be delineated by the Act wad <br />these Rasa; show a north arrow, note way section corners adjacem to nc~ <br />proposed operation, wad indicate the acre ;lu,~*~+ At a minimum, maps <br />mnst include the following information: <br />(2) Plan ~ <br />(a> outline and hdxl the permit boundaries, descn'bed is <br />Exhibit A -Legal Description; for all Limited l:mpac~t 110 and <br />Special 111 Operations, the Office considers the area bounded by <br />the permit boundary to be analogous to the affected area; <br />(b) label the Hama of owner(s) of record of Ute surface <br />of the affected area, of the land within two hundred (200) feet of the <br />affected area, identify the owner of the substance to be mined, and <br />the type of structure and owners of record of way permanent or <br />maw-made suucarrts within 200 feet of the affected area; <br />~t, <br />THE CODE OF COLORADO REGULATIONS 2 CCR 407-4 <br />