Laserfiche WebLink
TWENTYMILE COAL COMPANY - FOIDEL CREEK MINE <br />TR07-60 TECHNICAL ADEOUOCY RESPONSE -NEW TH ICKENER UNDERFLOW LINE <br />SUMMARY OF REVISIONS/ADDITIONS (05/22/07) <br />REVISION/ADDITION DESCRIPTION PLACEMENT INSTRUCTIONS <br />OPERATIONS PLAN -MINE FACILITIES ULE 2.05 <br />Pages 2.05-84.2, 84.3, 85, Revised operations and Replace Pages 2.05-84.2, 84.3, <br />97.3, 97.4, 102, 129, and 150 reclamation plan text describing 85, 97.3, 97.4, 102, 129, and 150 <br /> new thickener underflow line in Volume I <br />MAPS <br />Map 24, Surface Facilities and Revised map showing new Replaces Map 24 (1 of 3) in <br />Freshwater Systems (1 of 3) thickener underflow line, drop Volume V-A <br /> borehole, and thickener <br /> underflow dis osal areas <br />EXHIBITS <br />Exhibit 49K - Washplant R - Thickener Underflow Pipeline - Insert in Exhibit 49K in Volume <br />Design Drawings Foidel Creek Crossing Details R-E <br />