Laserfiche WebLink
C -' <br /> <br />ESTIMATING FORM - REVEGETATION WORK coot d <br />B. SNRUB b TREE TRANSPLANTS <br />SPECIES NAME ~ QUAN./ACRE <br />No transplants required <br />-____.~__-__-_-_-__s~-.-~-_-_ <br />C. SEEDBED PREPARATION <br /> <br />Filename : M009-12c <br />MATERIAL: PLANTING: ~ $/PERT. ~ TOTAL <br />STOCK TYPE E SIZE ~ $/PLANT ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ Sf PhAMC ~ PELLET <br />~ <br />~ <br />~ ' $/PLANT <br /> <br />~ ~ <br />~ ~ <br />~ ~ <br />______ _ <br /> <br /> <br /> <br />_ _____ <br />Total ~ <br />~ <br />~ <br />~ <br />__ <br />transplant ~ <br />~ <br />~ <br />~ <br />_ __ <br />cist/acre: <br />Tilling method pl: No seedbed preparation work requiretl <br />q2: <br />D. SEED APPLICATION Total cost Jacre: <br /> Seeding method: broadcast seeding 1'93 contr. data) Total cc st/acre: <br />sheet 2 of 2 <br />TOTAL <br />$/ACRE <br />$0.00 <br />50.00 <br />$0.00 <br />$O.DD <br />5150.00 <br />E. FERTILIZING <br />____~_____•_= FERTILIZER / SOIL AMENDMENT ~ UNITS/ACRE ~ UNIT ~ $/UNST ~ 5/ACRE <br />Materials used pl: ammonium nitrate 133-0-01 • ~ 120.00 ~ pound ~ 50.21 ~ 525 .20 <br /> q2: triple supetphospha[e 10-46-0) • ~ 100.00 ~ pound ~ 50.29 ~ 529 .00 <br /> p3: <br /> Total materials co ;[/acre: $59 .20 <br />Application method pl: hand held broadcast spreader ^ 5101. 63 <br /> q2: <br /> Total application cot t(acre: $101 .63 <br />F. MULCHING = ________ _ _ <br /> MULCH / NETTING / OTHER MATERIALS UN ITSjACRE UNIT <br />5/UNIT ~ <br />$/ACRE <br />Materials used pl: No mulch materials required ~ ~ ~ ~ $0. 00 <br /> p2: ~ ~ ~ ~ <br /> p3: <br /> q4: <br /> _____________________________:__....:__.___~_____ ~_____=_===f=~===__===== <br />Total ma[eria is == ~_____~__ <br />cos:/acre: ________ <br />$0. : <br />00 <br />Application method pl: No mulch application requiretl 50. 00 <br /> p2: <br /> p3: <br /> Total application cost /a cre~ 50. 00 <br />C. SOB CAST = __---- --- <br />Total area to be seeded: 6. ~~ acres. Total 5/acre $382.34 Toc al Initial Job Cost= 52, EB8. 45 <br />Estimated failure race: 50.00} of area. Total $/acres $382.39 Total Reseeding =oscs = $1,294 23 <br /> L • Reseeding cost items: A D E GRAND TOTAL SOB COST 53,882. 60 <br />