My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV92168
DRMS
>
Back File Migration
>
Revision
>
REV92168
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:13:37 AM
Creation date
11/21/2007 11:18:43 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
3/12/2003
Doc Name
Geotechnical Adequacy Review Letter
From
Joe Dudash
To
Byron Walker
Type & Sequence
PR7
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLOIZAUO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (303) 832-8106 <br />DATE: March 12, 2003 <br />TO: Byron Walker <br />FROM: Joe Dudash ~ ,~ <br />RE: Geotechnical A~equacy Review, PR-7, B-Seam Portal Construction, <br />PR-8, B-Seam Mine Plan, Bowie No. 2 Mine, Permit No. C-96-083, <br />Bowie Resources LTD. <br />DIVISION O F <br />MINERALS <br />GEOLOGY <br />RECLAMATION <br />MINING•SAFETY <br />Rill Owens <br />Governor <br />Greg E. Walther <br />Ezetutive Directof <br />Ronald W. Cattany <br />Division Director <br />As we discussed in our meeting on Mazch 10, 2003, I am requesting your assistance in <br />the geotechnical adequacy review of PR-7 and PR-8. Bowie Resources Limited (BRL) <br />wants to open up the B-seam for mining and will need to construct a new facilities bench, <br />two excess fill storage azeas, haul road and associated facilities structures. <br />The construction of the facilities complex to support the mining of the B-seam was <br />submitted in PR-7. You already have one copy of PR-7. I have a copy of Volume VII, <br />Geotechnical Studies, and the correspondence for the original pemut application, if you <br />need them again. Please review the geotechnical aspects of the cut and fill operations, <br />new roads and reclamation stability concerns. <br />The B-seam mine plan was submitted in PR-8. You have one copy of the PR-8 submittal. <br />I have ah'eady given to you the Volume I permit binder and Exhibit 15 of Volume III, <br />both of which contain the approved subsidence information for the currently approved <br />mine plan. Please do an adequacy review of the subsidence and geochemical information <br />in the submittal. <br />If you need any additional information, please let me know. Please keep each copy that <br />you have of PR-7 and PR-8 together in order to avoid mixing up the various submittals- <br />Thanks for your assistance. <br />cc: Sandy Brown <br />Dan Hernandez <br />c:/word/6 owie2/pr7 &8adegmemo 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.