Laserfiche WebLink
<br />RECLAMAifON COST SUMMARY oon['d <br />N. RE'/EGETA710N AND RESEEDING <br />Task d~ Task Description <br />______I__________________________________ <br />48 ~ Drill Seed Miz 3 <br />N. STRUCTURAL DEMOLITION 8 REMOVAL <br /> <br />Cosc (E) <br />519'7, 815 <br />Subtotal (M): E799,815 <br />Task R~ Task Descri pion <br />_ ~ Cost (E) <br />___ <br />____ <br />______I <br />49 ~ <br />.~ __________ <br />Demolish ___ <br />and ______________________ <br />Remove aLL Structures _____ <br />and _____ <br />____ <br />Debris __~ <br />____ <br />~ E1,471,561 <br />0. EQUIPMENT MOBILIZATION / DEMCBILIZAT ION <br />SubtocaL (N): E1, 471, 561 <br />Task X~ <br />_ <br />__ <br />____. <br />__ Task Descripc ion ~ <br />_____________________________________ <br />_____ Cost (E) <br />___________ <br />I <br />___ <br />50 ~ ,__ <br />Mobilize __ <br />Demobi Lize Equipment for Initial Reclama[i~ i:7, 354 <br />51 ~ Mobilize Demobilize Equi peen[ for Pond Removal ~ i6, 16S~ <br />52 ~ Nobi li2e Demobilize Equipment forSi ce Mai n[enance ~ 530,315' <br />~ <br />._ l ~ <br />~. <br />