My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV92062
DRMS
>
Back File Migration
>
Revision
>
REV92062
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:13:32 AM
Creation date
11/21/2007 11:17:50 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
11/17/1999
Doc Name
BOWIE 2 MINE PR3 DOWNHILL CONVEYOR & PRODUCTION INCREASE PN C-96-083
From
JE STOVER & ASSOCIATES
To
DMG
Type & Sequence
PR3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Colorado Division of Minerals and Geology <br />_________________________________________ <br />ESTIMATING FORM SEALING BORExOLES <br />Task #: L45 Prep. by: JRS Task Filename C083-OAS <br />_________ _________ ________ <br />Date: 2G-Sep-99 Permit #:C-96-083 Mine: Bowie No. 2 Nine <br />Permit Ac tian: Permit Revision 03 <br />Task Description: Seal 6" Alluvial 4ells <br />UNIT COSTS <br />____=____= Drill 4ater Flatbed Pickup Doter <br />Mobile Equipment: Rig Truck Truck truck (Ca[ D7H) Lasc update:199'7 (dozer) <br />Ownership Cost/hr = 544.18 E10.39 54.86 f2.40 536.36 <br />Operating Cos[/hr = E38.55 514.68 57.79 55.16 f45.1G <br />Operator Cost/hr 522.95 522.18 f22.35 f21.82 523.12 <br />Assistant Cost/hr = 522.06 50.00 50.00 50.00 50.00 <br /> Total = 5127.74 547.45 535.00 529.38 5104.62 <br />N aterials 8 Supplies: Oescription S/unit unit cf/unit <br /> Portland T <br />YPe II Cement <br />59.00 <br />90# sack -- <br />---_-----3.00--~-.~--_--_-__ <br /> Dry Granular Bentoni [e E6.00 100# sack 3.00 <br /> Surgel Abandonment Fluid 56.00 100# Sack 3.00 <br /> Otto Plug 54.35 each ~ NA <br /> Marker 52.00 each NA <br />ITEMIZED TASK BREAKOONN AND ASSOCIATED COSTS <br />BOREHOLE OR PROJE C7 I.D.: AU-1, A4-2, A4-3, A4-4, Av-5, AlJ-6 <br />Total Number of Holes: b No. Plugs/Hole: 1 <br />Av. Depth per Hole (f t.): 100. 33 Plug Ht. (ft.): 7 <br />Av. Diam, per Hole (in.): 6. 00 Type of Casing: N/A <br />Task Item <br />______________ <br />____ <br />_ Task Descripci on <br />__________________ <br />__________ <br />____ <br />_ <br />_________________ <br />____ Quantity <br />___________ <br />__ <br />_ <br />________ <br />Drill Rig ________ <br />Fill xale ___ _____________ ________ <br />48 _ <br />.00 <br />Va ter Truck Supply ua cer 48 .00 <br />Flatbed Truck Naul Supplies 48 .00 <br />Pickup Truck Xaul Crew 48 .00 <br />Doter Grade Pad 12 .00 <br />Avg. unit volume (cf/lf): 0.1963 <br />Tot. tem. plug vol. (cf): 8.25 <br />Remaining fill vol. (cf): 109.95 <br />Unit S/Unit Cost <br />hour 5127.74 56,131.52 <br />hour 5•:7.45 52,277.60 <br />hour 535.00 51,680.00 <br />hour 529.38 f1,410.24 <br />hour 5104.62 51, 255.GG <br />Ceme~nc Plug Hole 2. 75 sack 59.00 S2G.7A <br />Bentonice • FiIL Hole 36. 65 sack 56.00 5219.90 <br />Surgel <br />Octo•plug Plug 6. 00 ea. 54.35 526.10 <br />Ma rL:er Mark Hole 6. 00 ea. 52.00 512.00 <br />Mi s<:eLlaneaus Cut Casing 1. 50 hour 3125.00 5187.50 <br />• Sr.I eCL either bentor.i[e ar surge l; not boar. TOTAL DIRECT CCST f13,225.OL <br /> SGee: 1 0~ 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.