Laserfiche WebLink
<br />RECLAMATION COS7 SUMMARY conC'd <br />TOTAL DIRECT RECIAMAi[ON COSTS (subtotals A through P); 54,069,934 <br />If. INDIRECT COSTS <br />A. CONTRACTOR'S OVERMEAD 8 PROFIT <br />Item tl~ <br />__ Item Descri pcion ~ Cos[ (E) <br />____ <br />I <br />1. ~ ____________________________~______ <br />PubLic Liability Insurance..... ~________________~_ <br />1.5507. of di recta _____..____ <br />563,084 <br />2. ~ Contractor's Performance Bond.. 0.8bOX of direcc~ 535,001 <br />3. ~ Contractor's Profit............ 10.OOX of di recta 5406,993 <br />4. ~ Jab Superintendent.. ~ 57:,550 <br />Subtot aL (A): 5579,629 <br />TOTAL CONSTRUCTION CONTRACT ANOUNT (diretC plus 0 8 P); 54,649,563 <br />8. OMG PROJECT ADMINISTRATION EXPENSES <br />Item tl~ <br />___ Item Desc ri pcion <br />_ <br />_ <br />____ <br />____ ~ <br />__ Cost (E) <br />____ <br />______. <br />__ <br />_I <br />1. ~ ____ <br />_______________~______ <br />___ <br />_ <br />Project engineering fees at.... __ <br />_ <br />4.25X ____ <br />___~ <br />of Intr. ~ __ <br />5197,606 <br />2. ~ Staff admin. expense 0.75% of cncr. ~ 534,872 <br />Subtotal (8 ): 5232,478 <br />TOTAL INDIRECT RECLAMA7ION COSTS (subcota(s A through B): 5812,107 <br />NET INDIRECT COST PERCENTAGE: 19,95% <br />TOTAL PERFORMANCE BOND AMOUNT (DIRECT plus INDIRECT costs): 5»,982,041 <br />I[1. BOND STAtUS •- BCND RELEASE SUMMART <br />________________________________________________________________________ <br />