Laserfiche WebLink
<br />2 <br />This results in a net decrease of 4.9 PLS/ac, along with a 2.4 PLS/ac increase. Overall <br />results in 2.5 PLS/ac decrease. <br />The seeding rate is such that this decrease in PIS/ac should be insignificant. <br />Additionally, 5 locations will be planted with seedling nursery stock. The data submitted <br />does not designate the number of acres that will be planted with tree/shrub seedlings. The <br />only concern I have is, the operator has a commitment to establish 2000 stems/ac. Are the <br />shrub planting rates sufficient to meet this density? The operator will also live haul two <br />shrub clumps. <br />The operator also states that 3 herbicides will be used to aid in shrub establishment. These <br />herbicides are; DEVRINOL, GOAL, and OUST. Has approval of use of these herbicides <br />already been included in the permit, and have MSDS sheets been provided? <br />I have no other concerns with this submittal. <br />m: \coal\j hb\c8000593.smx <br />