Laserfiche WebLink
CIRCES Cost Estimating SORware <br />EQUIPMENT MOBILIZATION I DEMOBILIZATION <br />PROJECT IDENTIFICATION <br />Agenry or organi¢ation name : DMG <br />Tasks: 04a State:Caorado Pertnillob x:M-7986000 <br />Date: 0/252005 County :Delta Abbreviation :none <br />Dser: SSS Site :Srantlslatlt ROCk Pd Filename :MW4-04a <br />Permit or other job action <br />Task description <br /> Nearest rrejor city or town vnthin project area region : Delta <br />Transoortat'on CvGe T'Ine' Non- Total one-way Vavel distance: 4.0 roles <br /> Roatlabfe Roadable Average travel speetl: 40.0 mph <br /> Equipment Equipment <br />Haul time (hours)= 0.10 0.10 Total nonioatlable rrpWtlemob cost': $]86.36 <br />Returntime (hours)= 0.10 010 'N.a mum tops vnm Maui ne <br />Loatlmg lime (hours) = 0.50 NA Total matlable rtab/tlemob cost--: $000 <br />Unloading time (hours) = 0.50 NA ane mum mp, m naw M <br />Subtotals= 1.20 020 <br />JOB TIME AND COST Total job hme: 1.40 hours <br />Total job cost : 5786 <br />EQUIPMENT TRANSPORT RIG COST $hifl basis : 1 per tlay <br />Cost tlata source : CRG Dafa <br />