My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-01-25_REVISION - M1986004
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1986004
>
2005-01-25_REVISION - M1986004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:45 AM
Creation date
11/21/2007 11:17:03 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986004
IBM Index Class Name
Revision
Doc Date
1/25/2005
Doc Name
Routine bond recalculation
From
DMG
To
File
Type & Sequence
SI1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 02a <br />Date : 01/25/2005 <br />User: SSS <br />State :Colorado <br />County :Delta <br />Site : Brandstadt Rock Pit <br />Agency or organization name : DMG <br />Permit or other job action :Routine bond recalculation <br />Task description :Replace fOpS011 Over <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D7R Series 11 - 7SU Horsepower : 240 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $40.61 NA <br />Operating cosUhour : $48.13 100 <br />Ripper op. cosUhour : $0.00 0 <br />Operator cosUhour : $31.76 NA <br />Total unit cosUhour : $120.50 Total fleet cosUhour : $120.50 <br />;;: <br />MATERIAL QUANTITIES > <br />Initial Swell Loose <br />volume : 1,500 LCY factor : NA volume : 1,500 LCY <br />Source of estimated volume :Exhibit H <br />Source of estimated swell factor :NA <br />,; <br />HOURLY PRODUCTION s: <br />Job Condition Correction Factors _;:: <br />Source <br />Average push distance : 75 feet <br />Unadjusted hourly production : 854.1 LCY/hr <br />Material consistency description <br />Partly consolidated stockpile <br />Average push gradient : 16.00 % (r <br />Average site altitude : 5,180 feet <br />Material weight : 1,600 Ibs/LCY <br />Weight description <br />Top Soil <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.152 1LCY <br />Operator skill : 0.75 <br />Material consistency : 1.10 <br />Dozing method : 1.00 <br />Visibility : 1.00 j <br />Job effciency : 0.83 <br />Spoil pile : 0.70 <br />Push gradient : 1.35 <br />~ <br />Altitude : I <br />1.00 <br />Material weight : 1.44 I <br />Blade type : 1.00 <br />Net correction : 0.93 <br />HB) <br />Adjusted unit production : 793.60 LCY/hr <br />Adjusted fleet production : 793.60 LCY/hr <br />Total job time : 1.89 Hours <br />Total job cost : $228 <br />Permivjob# : M-1986-004 <br />Abbreviation :none <br />Filename : M004-02a <br />
The URL can be used to link to this page
Your browser does not support the video tag.